IDEAS home Printed from https://ideas.repec.org/a/spr/operea/v18y2018i2d10.1007_s12351-016-0266-5.html
   My bibliography  Save this article

Integration of resource investment problem with quantity discount problem in material ordering for minimizing resource costs of projects

Author

Listed:
  • Aria Shahsavar

    (Islamic Azad University)

  • Nima Zoraghi

    (Islamic Azad University)

  • Babak Abbasi

    (RMIT University)

Abstract

Minimizing the costs in a project is highly tied with the way the required resources are provided. The resource investment problem deals with how to employ the renewable resources such that the related costs are minimized. Furthermore, the material ordering problem alludes to outlining a proper plan for supplying the nonrenewable resources (materials) to minimize the associated costs. The present paper studies the integration of the resource investment problem with the quantity discount problem in material ordering to thoroughly investigate the resource costs of projects in a single circumstance. The integrated model is presented and mathematically formulated. Three hybrid procedures are proposed for the model, each of which includes a genetic algorithm combined with a dynamic programming, a simulated annealing or a particle swarm optimization algorithm. The mathematical formulations of some small instances are solved to be the subject of an exact comparison with hybrid procedures. The proposed procedures are tested on a set of 810 benchmarks known in the literature. The computational experiments reported by algorithms validate the efficiency of the hybrid genetic algorithm and dynamic programming for the model more than other hybrid approaches.

Suggested Citation

  • Aria Shahsavar & Nima Zoraghi & Babak Abbasi, 2018. "Integration of resource investment problem with quantity discount problem in material ordering for minimizing resource costs of projects," Operational Research, Springer, vol. 18(2), pages 315-342, July.
  • Handle: RePEc:spr:operea:v:18:y:2018:i:2:d:10.1007_s12351-016-0266-5
    DOI: 10.1007/s12351-016-0266-5
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s12351-016-0266-5
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s12351-016-0266-5?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Erik Demeulemeester, 1995. "Minimizing Resource Availability Costs in Time-Limited Project Networks," Management Science, INFORMS, vol. 41(10), pages 1590-1598, October.
    2. Munson, C.L. & Hu, J., 2010. "Incorporating quantity discounts and their inventory impacts into the centralized purchasing decision," European Journal of Operational Research, Elsevier, vol. 201(2), pages 581-592, March.
    3. Awi Federgruen & Chung‐Yee Lee, 1990. "The dynamic lot size model with quantity discount," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(5), pages 707-713, October.
    4. Alan S. Manne, 1958. "Programming of Economic Lot Sizes," Management Science, INFORMS, vol. 4(2), pages 115-135, January.
    5. Hark-Chin Hwang & Wilco van den Heuvel & Albert Wagelmans, 2013. "The economic lot-sizing problem with lost sales and bounded inventory," IISE Transactions, Taylor & Francis Journals, vol. 45(8), pages 912-924.
    6. Thomas Schmitt & Bruce Faaland, 2004. "Scheduling recurrent construction," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(8), pages 1102-1128, December.
    7. Shadrokh, Shahram & Kianfar, Fereydoon, 2007. "A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty," European Journal of Operational Research, Elsevier, vol. 181(1), pages 86-101, August.
    8. Munson, Charles L. & Jackson, Jonathan, 2015. "Quantity Discounts: An Overview and Practical Guide for Buyers and Sellers," Foundations and Trends(R) in Technology, Information and Operations Management, now publishers, vol. 8(1-2), pages 1-130, June.
    9. A Drexl & A Kimms, 2001. "Optimization guided lower and upper bounds for the resource investment problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(3), pages 340-351, March.
    10. Erdem Colak & Meral Azizoglu, 2014. "A resource investment problem with time/resource trade-offs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 65(5), pages 777-790, May.
    11. Yamashita, Denise Sato & Armentano, Vinicius Amaral & Laguna, Manuel, 2006. "Scatter search for project scheduling with resource availability cost," European Journal of Operational Research, Elsevier, vol. 169(2), pages 623-637, March.
    12. Behrouz Afshar-Nadjafi & Mohammad Arani, 2014. "Multimode Preemptive Resource Investment Problem Subject to Due Dates for Activities: Formulation and Solution Procedure," Advances in Operations Research, Hindawi, vol. 2014, pages 1-10, September.
    13. Yu-Jen Lin & Chia-Huei Ho, 2011. "Integrated inventory model with quantity discount and price-sensitive demand," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 19(1), pages 177-188, July.
    14. Neumann, K. & Zimmermann, J., 2000. "Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints," European Journal of Operational Research, Elsevier, vol. 127(2), pages 425-443, December.
    15. Benton, W. C. & Park, Seungwook, 1996. "A classification of literature on determining the lot size under quantity discounts," European Journal of Operational Research, Elsevier, vol. 92(2), pages 219-238, July.
    16. Akbalik, Ayse & Rapine, Christophe, 2013. "The single item uncapacitated lot-sizing problem with time-dependent batch sizes: NP-hard and polynomial cases," European Journal of Operational Research, Elsevier, vol. 229(2), pages 353-363.
    17. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
    18. Mendoza, Abraham & Ventura, José A., 2008. "Incorporating quantity discounts to the EOQ model with transportation costs," International Journal of Production Economics, Elsevier, vol. 113(2), pages 754-765, June.
    19. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
    20. Manerba, Daniele & Mansini, Renata, 2012. "An exact algorithm for the Capacitated Total Quantity Discount Problem," European Journal of Operational Research, Elsevier, vol. 222(2), pages 287-300.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wen-Hsien Tsai, 2018. "A Green Quality Management Decision Model with Carbon Tax and Capacity Expansion under Activity-Based Costing (ABC)—A Case Study in the Tire Manufacturing Industry," Energies, MDPI, vol. 11(7), pages 1-30, July.
    2. Kirschstein, Thomas & Meisel, Frank, 2019. "A multi-period multi-commodity lot-sizing problem with supplier selection, storage selection and discounts for the process industry," European Journal of Operational Research, Elsevier, vol. 279(2), pages 393-406.
    3. Patoghi, Amirhosein & Mousavi, Seyed Meysam, 2021. "A new approach for material ordering and multi-mode resource constraint project scheduling problem in a multi-site context under interval-valued fuzzy uncertainty," Technological Forecasting and Social Change, Elsevier, vol. 173(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Patrick Gerhards, 2020. "The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 42(4), pages 901-933, December.
    2. Cédric Verbeeck & Vincent Peteghem & Mario Vanhoucke & Pieter Vansteenwegen & El-Houssaine Aghezzaf, 2017. "A metaheuristic solution approach for the time-constrained project scheduling problem," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(2), pages 353-371, March.
    3. Zhu, Xia & Ruiz, Rubén & Li, Shiyu & Li, Xiaoping, 2017. "An effective heuristic for project scheduling with resource availability cost," European Journal of Operational Research, Elsevier, vol. 257(3), pages 746-762.
    4. Kreter, Stefan & Schutt, Andreas & Stuckey, Peter J. & Zimmermann, Jürgen, 2018. "Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems," European Journal of Operational Research, Elsevier, vol. 266(2), pages 472-486.
    5. Rodrigues, Sávio B. & Yamashita, Denise S., 2010. "An exact algorithm for minimizing resource availability costs in project scheduling," European Journal of Operational Research, Elsevier, vol. 206(3), pages 562-568, November.
    6. Kirschstein, Thomas & Meisel, Frank, 2019. "A multi-period multi-commodity lot-sizing problem with supplier selection, storage selection and discounts for the process industry," European Journal of Operational Research, Elsevier, vol. 279(2), pages 393-406.
    7. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    8. Masoud Arjmand & Amir Abbas Najafi & Majid Ebrahimzadeh, 2020. "Evolutionary algorithms for multi-objective stochastic resource availability cost problem," OPSEARCH, Springer;Operational Research Society of India, vol. 57(3), pages 935-985, September.
    9. Melega, Gislaine Mara & de Araujo, Silvio Alexandre & Jans, Raf, 2018. "Classification and literature review of integrated lot-sizing and cutting stock problems," European Journal of Operational Research, Elsevier, vol. 271(1), pages 1-19.
    10. Jackson, Jonathan E. & Munson, Charles L., 2016. "Shared resource capacity expansion decisions for multiple products with quantity discounts," European Journal of Operational Research, Elsevier, vol. 253(3), pages 602-613.
    11. Manerba, Daniele & Mansini, Renata & Perboli, Guido, 2018. "The Capacitated Supplier Selection problem with Total Quantity Discount policy and Activation Costs under uncertainty," International Journal of Production Economics, Elsevier, vol. 198(C), pages 119-132.
    12. Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
    13. Song, Zhuzhu & Tang, Wansheng & Zhao, Ruiqing, 2019. "Encroachment and canvassing strategy in a sea-cargo service chain with empty container repositioning," European Journal of Operational Research, Elsevier, vol. 276(1), pages 175-186.
    14. Qingyou Yan & Qian Zhang & Xin Zou, 2016. "A Cost Optimization Model for Multiresource Leveling Problem without Project Duration Constraint," Discrete Dynamics in Nature and Society, Hindawi, vol. 2016, pages 1-8, July.
    15. Hartmann, Sönke & Briskorn, Dirk, 2008. "A survey of variants and extensions of the resource-constrained project scheduling problem," Working Paper Series 02/2008, Hamburg School of Business Administration (HSBA).
    16. Berk, Emre & Toy, Ayhan Ozgur & Hazir, Oncu, 2008. "Single item lot-sizing problem for a warm/cold process with immediate lost sales," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1251-1267, June.
    17. Farhat, Mlouka & Akbalik, Ayse & Hadj-Alouane, Atidel B. & Sauer, Nathalie, 2019. "Lot sizing problem with batch ordering under periodic buyback contract and lost sales," International Journal of Production Economics, Elsevier, vol. 208(C), pages 500-511.
    18. Ou, Jinwen & Feng, Jiejian, 2019. "Production lot-sizing with dynamic capacity adjustment," European Journal of Operational Research, Elsevier, vol. 272(1), pages 261-269.
    19. Taleizadeh, Ata Allah & Pentico, David W., 2014. "An Economic Order Quantity model with partial backordering and all-units discount," International Journal of Production Economics, Elsevier, vol. 155(C), pages 172-184.
    20. Süral, Haldun & Denizel, Meltem & Van Wassenhove, Luk N., 2009. "Lagrangean relaxation based heuristics for lot sizing with setup times," European Journal of Operational Research, Elsevier, vol. 194(1), pages 51-63, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:operea:v:18:y:2018:i:2:d:10.1007_s12351-016-0266-5. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.