IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v58y2020i21p6568-6584.html
   My bibliography  Save this article

Scheduling flowline manufacturing cells with inter-cellular moves: non-permutation schedules and material flows in the cell scheduling problem

Author

Listed:
  • J. S. Neufeld
  • F. F. Teucher
  • U. Buscher

Abstract

A major goal of the concept of cellular manufacturing is to form independent cells. However, the formation of entirely independent cells is rarely found in practice, where inter-cellular transports of jobs are often accepted to a certain level. The resulting scheduling task in flowline manufacturing cells is referred to as cell scheduling problem. Usually it is modelled and solved analogously to the group scheduling problem, which arises within a single cell with multiple part families. In this study, we point out several characteristics that specify the distinctiveness of cell scheduling. Furthermore, a new cell-based objective, namely total cell makespan, is introduced. As no appropriate benchmark instances are available so far, new test problems are developed, that integrate the derived characteristics. In an extensive computational study known constructive heuristics as well as simulated annealing algorithms to generate permutation and non-permutation schedules are tested. It is revealed that especially the type of material flows between cells has an immense impact on the algorithms' performance. The findings support a better problem understanding and point out the necessity of developing new heuristics especially for certain types of the cell scheduling problem.

Suggested Citation

  • J. S. Neufeld & F. F. Teucher & U. Buscher, 2020. "Scheduling flowline manufacturing cells with inter-cellular moves: non-permutation schedules and material flows in the cell scheduling problem," International Journal of Production Research, Taylor & Francis Journals, vol. 58(21), pages 6568-6584, November.
  • Handle: RePEc:taf:tprsxx:v:58:y:2020:i:21:p:6568-6584
    DOI: 10.1080/00207543.2019.1683251
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2019.1683251
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2019.1683251?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zhuang Huang & Jianjun Yang, 2020. "Scheduling Optimization in Flowline Manufacturing Cell Considering Intercell Movement with Harmony Search Approach," Mathematics, MDPI, vol. 8(12), pages 1-21, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:58:y:2020:i:21:p:6568-6584. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.