Evaluating order acceptance policies for divergent production systems with co-production
Author
Abstract
Suggested Citation
DOI: 10.1080/00207543.2016.1193250
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- CRAMA, Yves & POCHET, Yves & WERA, Yannic, 2001. "A discussion of production planning approaches in the process industry," LIDAM Discussion Papers CORE 2001042, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Oner, Selma & Bilgic, Taner, 2008. "Economic lot scheduling with uncontrolled co-production," European Journal of Operational Research, Elsevier, vol. 188(3), pages 793-810, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Caner TaskIn, Z. & Tamer Ünal, A., 2009. "Tactical level planning in float glass manufacturing with co-production, random yields and substitutable products," European Journal of Operational Research, Elsevier, vol. 199(1), pages 252-261, November.
- Vidal-Carreras, Pilar I. & Garcia-Sabater, Jose P. & Coronado-Hernandez, Jairo R., 2012. "Economic lot scheduling with deliberated and controlled coproduction," European Journal of Operational Research, Elsevier, vol. 219(2), pages 396-404.
- Rafiei, Rezvan & Nourelfath, Mustapha & Gaudreault, Jonathan & De Santa-Eulalia, Luis Antonio & Bouchard, Mathieu, 2015. "Dynamic safety stock in co-production demand-driven wood remanufacturing mills: A case study," International Journal of Production Economics, Elsevier, vol. 165(C), pages 90-99.
- Romsdal, Anita & Strandhagen, Jan Ola & Dreyer, Heidi Carin, 2014. "Can Differentiated Production Planning and Control enable both Responsiveness and Efficiency in Food Production?," 2014 International European Forum, February 17-21, 2014, Innsbruck-Igls, Austria 199374, International European Forum on System Dynamics and Innovation in Food Networks.
- Ho, Jyh-Wen & Fang, Chih-Chiang, 2013. "Production capacity planning for multiple products under uncertain demand conditions," International Journal of Production Economics, Elsevier, vol. 141(2), pages 593-604.
- Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Romsdal, Anita & Strandhagen, Jan Ola & Dreyer, Heidi Carin, 2014. "Can Differentiated Production Planning and Control enable both Responsiveness and Efficiency in Food Production?," International Journal on Food System Dynamics, International Center for Management, Communication, and Research, vol. 5(1), pages 1-10, August.
- Eldon A. Gunn & Corinne A. MacDonald & Andrea Friars & Glen Caissie, 2014. "Scotsburn Dairy Group Uses a Hierarchical Production Scheduling and Inventory Management System to Control Its Ice Cream Production," Interfaces, INFORMS, vol. 44(3), pages 253-268, June.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:55:y:2017:i:13:p:3631-3643. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.