IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v53y2015i9p2787-2802.html
   My bibliography  Save this article

Synchronisation of production scheduling and shipment in an assembly flowshop

Author

Listed:
  • Jian Chen
  • George Q. Huang
  • Hao Luo
  • Junqiang Wang

Abstract

This paper studies a synchronised scheduling problem of production simultaneity and shipment punctuality in a two-stage assembly flowshop system. Production simultaneity seeks to ensure all products belonging to a same customer order are simultaneously completed (at least as close as possible). Shipment punctuality attempts to satisfy orders’ individual shipment due dates. We provide two criteria, i.e. mean longest waiting duration and mean earliness and tardiness, for measuring production simultaneity and shipment punctuality, respectively. A synchronised scheduling model is developed by balancing the two criteria using linear weighted sum method. A modified genetic algorithm (GA) is then proposed for solving this model. Numerical studies demonstrate the effectiveness of the proposed approach. The results indicate that considering production simultaneity can remarkably reduce finished products inventory. A prioritised weight combination interval for production simultaneity and shipment punctuality has been suggested. Production simultaneity is affected by the production system configuration, especially in peak seasons.

Suggested Citation

  • Jian Chen & George Q. Huang & Hao Luo & Junqiang Wang, 2015. "Synchronisation of production scheduling and shipment in an assembly flowshop," International Journal of Production Research, Taylor & Francis Journals, vol. 53(9), pages 2787-2802, May.
  • Handle: RePEc:taf:tprsxx:v:53:y:2015:i:9:p:2787-2802
    DOI: 10.1080/00207543.2014.994075
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2014.994075
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2014.994075?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Liu, Yu & Zhang, Qin & Ouyang, Zhiyuan & Huang, Hong-Zhong, 2021. "Integrated production planning and preventive maintenance scheduling for synchronized parallel machines," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    2. Guo, Daqiang & Li, Mingxing & Lyu, Zhongyuan & Kang, Kai & Wu, Wei & Zhong, Ray Y. & Huang, George Q., 2021. "Synchroperation in industry 4.0 manufacturing," International Journal of Production Economics, Elsevier, vol. 238(C).
    3. Chen, Jian & Huang, George Q. & Wang, Jun-Qiang & Yang, Chen, 2019. "A cooperative approach to service booking and scheduling in cloud manufacturing," European Journal of Operational Research, Elsevier, vol. 273(3), pages 861-873.
    4. Xianghua Chu & Su Xiu Xu & Fulin Cai & Jiansheng Chen & Quande Qin, 2019. "An efficient auction mechanism for regional logistics synchronization," Journal of Intelligent Manufacturing, Springer, vol. 30(7), pages 2715-2731, October.
    5. Luo, Hao & Yang, Xuan & Kong, Xiang T.R., 2019. "A synchronized production-warehouse management solution for reengineering the online-offline integrated order fulfillment," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 122(C), pages 211-230.
    6. Jian Chen & Meilin Wang & Xiang T. R. Kong & George Q. Huang & Qinyun Dai & Guoqiang Shi, 2019. "Manufacturing synchronization in a hybrid flowshop with dynamic order arrivals," Journal of Intelligent Manufacturing, Springer, vol. 30(7), pages 2659-2668, October.
    7. Framinan, Jose M. & Perez-Gonzalez, Paz & Fernandez-Viagas, Victor, 2019. "Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures," European Journal of Operational Research, Elsevier, vol. 273(2), pages 401-417.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:53:y:2015:i:9:p:2787-2802. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.