IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v37y2019i12p727-739.html
   My bibliography  Save this article

A many-objective optimization model for construction scheduling

Author

Listed:
  • Abhilasha Panwar
  • Kumar Neeraj Jha

Abstract

In recent years, the number of stakeholders of construction projects has significantly increased; this has required the simultaneous achievement of competing objectives, such as reductions in the time, cost, resources, and environmental impact of a project, for example. In order to achieve a balance between these objectives, several multiple-objective construction scheduling models have been reported in the literature. However, several challenges have been encountered, due to the complexities of modelling and visualizing more than three objectives simultaneously. Some of these challenges are addressed in this work via the development of a many-objective scheduling model (MOSM) based on a non-dominated sorting genetic algorithm for the simultaneous optimization of four objectives: time, cost, resources and environmental impact. Coordinate plots are used to visualize the trade-offs made between all four of these objectives. A weighted sum is introduced that offers the project team the freedom to choose an optimal solution, depending on the specific priorities of the project, and the practical application of the model is demonstrated via a case study. Our MOSM allows the optimal outcome to be achieved in construction projects with multiple objectives.

Suggested Citation

  • Abhilasha Panwar & Kumar Neeraj Jha, 2019. "A many-objective optimization model for construction scheduling," Construction Management and Economics, Taylor & Francis Journals, vol. 37(12), pages 727-739, December.
  • Handle: RePEc:taf:conmgt:v:37:y:2019:i:12:p:727-739
    DOI: 10.1080/01446193.2019.1590615
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01446193.2019.1590615
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2019.1590615?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zhiwu Zhou & Julián Alcalá & Víctor Yepes, 2021. "Optimized Application of Sustainable Development Strategy in International Engineering Project Management," Mathematics, MDPI, vol. 9(14), pages 1-29, July.
    2. Borna Dasović & Uroš Klanšek, 2022. "A Review of Energy-Efficient and Sustainable Construction Scheduling Supported with Optimization Tools," Energies, MDPI, vol. 15(7), pages 1-17, March.
    3. Michał Tomczak & Piotr Jaśkowski, 2021. "Preferences of Construction Managers Regarding the Quality and Optimization Criteria of Project Schedules," Sustainability, MDPI, vol. 13(2), pages 1-22, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:37:y:2019:i:12:p:727-739. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.