IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v28y2010i1p75-88.html
   My bibliography  Save this article

Multi-objective particle swarm optimization for construction time-cost tradeoff problems

Author

Listed:
  • Hong Zhang
  • Heng Li

Abstract

Reduction in construction project duration is generally linked to additional cost due to more expensive resources required. Hence tradeoff between time and cost is crucial to the efficiency of a construction project. The time-cost tradeoff (TCT) issue has been studied through various multi-objective optimization methodologies to determine an optimal set of activity methods with the objectives of minimizing project duration and total cost. A multi-objective particle swarm optimization that adopts a combined scheme for determining the global best of each particle is presented for solving the TCT problem. The candidate TCT solutions in terms of a set of construction methods for activities are represented through the multidimensional particles. The framework of the combined scheme-based multi-objective particle swarm optimization (CSMOPSO) is developed. Computational analyses are conducted to investigate the performance of the CSMOPSO, including comparison with other methods. This study is expected to provide an alternative solving methodology for the TCT problem and help contractors or engineers plan construction methods with optimal time-cost tradeoff.

Suggested Citation

  • Hong Zhang & Heng Li, 2010. "Multi-objective particle swarm optimization for construction time-cost tradeoff problems," Construction Management and Economics, Taylor & Francis Journals, vol. 28(1), pages 75-88.
  • Handle: RePEc:taf:conmgt:v:28:y:2010:i:1:p:75-88
    DOI: 10.1080/01446190903406170
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190903406170
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190903406170?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Osama Mohamed ElSahly & Salma Ahmed & Akmal Abdelfatah, 2023. "Systematic Review of the Time-Cost Optimization Models in Construction Management," Sustainability, MDPI, vol. 15(6), pages 1-20, March.
    2. Fang Fu & Tao Zhang, 2016. "A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction," PLOS ONE, Public Library of Science, vol. 11(12), pages 1-15, December.
    3. Erfan Khosravani Moghadam & Mohammad Sharifi & Shahin Rafiee & Young Ki Chang, 2019. "Time–Cost–Quality Trade-Off in a Broiler Production Project Using Meta-Heuristic Algorithms: A Case Study," Agriculture, MDPI, vol. 10(1), pages 1-18, December.
    4. Kerkhove, L.P. & Vanhoucke, M., 2016. "Incentive contract design for projects: The owner׳s perspective," Omega, Elsevier, vol. 62(C), pages 93-114.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:28:y:2010:i:1:p:75-88. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.