Knowledge-based diagnosis model for PCM executing problems in public construction

Author

Listed:
  • Ching-Hwang Wang
  • Chia-Chang Tsai
  • Yi-Yen Cheng

Abstract

A knowledge-based diagnosis model for PCM executing problems in Taiwan public construction is proposed by using a new fuzzy-neural approach. The diagnosis model confirms the causalities of the critical executing problems. By inputting the fuzziness of semantic description of the problems in the design phase this model can deduce the corresponding influence of the problems in the construction phase. The gravity of the problem is measured by the specific lagging percentage of estimated pricing progress. Finally, the data is integrated into a database management system to facilitate application, so as to make this diagnosis model an efficient instrument for public construction management.

Suggested Citation

  • Ching-Hwang Wang & Chia-Chang Tsai & Yi-Yen Cheng, 2007. "Knowledge-based diagnosis model for PCM executing problems in public construction," Construction Management and Economics, Taylor & Francis Journals, vol. 25(2), pages 129-142.
  • Handle: RePEc:taf:conmgt:v:25:y:2007:i:2:p:129-142
    DOI: 10.1080/01446190600799091
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190600799091
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190600799091?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Dengke Yu & Jay Yang, 2018. "Knowledge Management Research in the Construction Industry: a Review," Journal of the Knowledge Economy, Springer;Portland International Center for Management of Engineering and Technology (PICMET), vol. 9(3), pages 782-803, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:25:y:2007:i:2:p:129-142. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.