Resource constrained project scheduling using simulation

Author

Listed:
  • Mohammad Ammar
  • Youssef Mohieldin

Abstract

Resource allocation is one of the most important issues of construction management. Two problems of resource allocation are of concern: resource levelling and resource scheduling. Traditionally, the resource scheduling problem is solved using either heuristic methods or optimization techniques. When heuristic methods are used, resource scheduling is treated as a subsequent problem for the CPM analysis. In this paper, the resource scheduling problem is handled using simulation, where logic dependence and resource availability limits are considered simultaneously during the time scheduling process. Simulation is applied to the resource scheduling problem at the project level. A simulation system called SIRBUS is used to schedule construction projects under resource constraints. Constant resource demand of activities is assumed, and the activity once started cannot be interrupted. Six example projects previously solved by different heuristic methods are re-solved using simulation. The results are compared with the latest heuristic models: current float technique and ranked positional weight method. In addition to the advantage that resource availability is considered during time scheduling as a starting point, which is an apparent feature of simulation, SIRBUS gives good results compared with existing heuristic methods.

Suggested Citation

  • Mohammad Ammar & Youssef Mohieldin, 2002. "Resource constrained project scheduling using simulation," Construction Management and Economics, Taylor & Francis Journals, vol. 20(4), pages 323-330.
  • Handle: RePEc:taf:conmgt:v:20:y:2002:i:4:p:323-330
    DOI: 10.1080/01446190210131098
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190210131098
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190210131098?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Liu Shu-Shun & Kuo-Chuan Shih, 2009. "A framework of critical resource chain for project schedule analysis," Construction Management and Economics, Taylor & Francis Journals, vol. 27(9), pages 857-869.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:20:y:2002:i:4:p:323-330. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.