IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v20y2002i2p119-130.html
   My bibliography  Save this article

Time to build options in construction processes

Author

Listed:
  • Tien Foo Sing

Abstract

Time to build is a very important factor in a real estate development venture. Delay in completion of a project not only affects the financing costs and the rental revenue but also it may, on a more strategic note, determine the success or failure of a project. A time to build option model consisting of a stochastic rate of completion and a stochastic net project payoff is applied to the sequential construction process of a large scale construction project. The results of the sensitivity analysis show that the optimal payoff value, that triggers the exercise of the option to invest at a maximum rate, increases positively with the increases in cash flow volatility, input cost uncertainty, excess asset return per unit risk and maximum rate of investment. However, it has a negative relationship with the rental yield. In a case study involving a commercial project, the premium for hedging the payoff risks by pre-leasing a project was estimated at 11.29%, whereas the additional cost incurred for shielding a project against input cost risks in a design and build contract was estimated at 7.80%, where each is given as a percentage of the total construction costs.

Suggested Citation

  • Tien Foo Sing, 2002. "Time to build options in construction processes," Construction Management and Economics, Taylor & Francis Journals, vol. 20(2), pages 119-130.
  • Handle: RePEc:taf:conmgt:v:20:y:2002:i:2:p:119-130
    DOI: 10.1080/0144619011010209
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/0144619011010209
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/0144619011010209?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. C. Y. Yiu & C. S. Tam, 2006. "Rational under-pricing in bidding strategy: a real options model," Construction Management and Economics, Taylor & Francis Journals, vol. 24(5), pages 475-484.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:20:y:2002:i:2:p:119-130. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.