Construction related factors influencing the choice of concrete floor systems
Author
Abstract
Suggested Citation
DOI: 10.1080/01446190110101218
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- D. G. Proverbs & G. D. Holt & P. O. Olomolaiye, 1999. "European construction contractors: a productivity appraisal of in situ concrete operations," Construction Management and Economics, Taylor & Francis Journals, vol. 17(2), pages 221-230.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hamzah E. Alqudah & Mani Poshdar & Luqman Oyekunle Oyewobi & James Olabode Bamidele Rotimi & John Tookey, 2023. "Sustaining Construction Organisations in NZ: A Linear Regression Model Approach to Analysing Determinants of Their Performance," Sustainability, MDPI, vol. 15(5), pages 1-18, February.
- Yongsheng Jiang & Dong Zhao & Dedong Wang & Yudong Xing, 2019. "Sustainable Performance of Buildings through Modular Prefabrication in the Construction Phase: A Comparative Study," Sustainability, MDPI, vol. 11(20), pages 1-15, October.
- Damci Atilla & Arditi David & Polat Gul & Turkoglu Harun, 2020. "Motivation of civil engineers and architects in Turkey," Organization, Technology and Management in Construction, Sciendo, vol. 12(1), pages 2044-2052, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- D. G. Proverbs & G. D. Holt, 2000. "A theoretical model for optimum project (time) performance based on European best practice," Construction Management and Economics, Taylor & Francis Journals, vol. 18(6), pages 657-665, December.
- Mohan Raj Manavazhi & Zhang Xunzhi, 2001. "Productivity oriented analysis of design revisions," Construction Management and Economics, Taylor & Francis Journals, vol. 19(4), pages 379-391.
- Abdullahi Umar & Noor Amila Zawawi & Mohd Faris Khamidi & Arazi Idrus, 2013. "Stakeholder Perceptions on Achieved Benefits of PFI Procurement Strategy," Modern Applied Science, Canadian Center of Science and Education, vol. 7(4), pages 1-31, April.
More about this item
Keywords
Concrete Floors; Frame Construction; Selection Factors;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:20:y:2002:i:1:p:13-19. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.