IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v18y2000i6p657-665.html
   My bibliography  Save this article

A theoretical model for optimum project (time) performance based on European best practice

Author

Listed:
  • D. G. Proverbs
  • G. D. Holt

Abstract

The authors have over recent years performed extensive empirical research into European (UK, French and German) construction contractor performance. This paper represents the culmination of that research, by presenting a model for achieving optimum project time performance based on European best practice. By removing or neutralizing the impact of external factors (e.g. procurement method), the research concentrated on contractor practices and their direct impact on construction time performance. A variety of European contractor performance data were analysed to identify optimum solutions (i.e. contractors, construction practices) for achieving fastest project completion. The principal theme of the paper is graphical presentation and description of a theoretical model for optimum project (time) performance based on European best practice. Further, characteristics of UK, French and German variants of the model are presented. The application of multiple regression analysis to the data suggests that there are other factors, not embraced by the model, that may also impact significantly upon construction time performance. European contractors and clients may wish to consider the characteristics of these model(s) in striving to achieve earliest project completion.

Suggested Citation

  • D. G. Proverbs & G. D. Holt, 2000. "A theoretical model for optimum project (time) performance based on European best practice," Construction Management and Economics, Taylor & Francis Journals, vol. 18(6), pages 657-665, December.
  • Handle: RePEc:taf:conmgt:v:18:y:2000:i:6:p:657-665
    DOI: 10.1080/014461900414718
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/014461900414718
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/014461900414718?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. D. G. Proverbs & G. D. Holt & P. O. Olomolaiye, 1999. "European construction contractors: a productivity appraisal of in situ concrete operations," Construction Management and Economics, Taylor & Francis Journals, vol. 17(2), pages 221-230.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mohan Raj Manavazhi & Zhang Xunzhi, 2001. "Productivity oriented analysis of design revisions," Construction Management and Economics, Taylor & Francis Journals, vol. 19(4), pages 379-391.
    2. Abdullahi Umar & Noor Amila Zawawi & Mohd Faris Khamidi & Arazi Idrus, 2013. "Stakeholder Perceptions on Achieved Benefits of PFI Procurement Strategy," Modern Applied Science, Canadian Center of Science and Education, vol. 7(4), pages 1-31, April.
    3. A. B. Idrus & J. B. Newman, 2002. "Construction related factors influencing the choice of concrete floor systems," Construction Management and Economics, Taylor & Francis Journals, vol. 20(1), pages 13-19.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:18:y:2000:i:6:p:657-665. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.