Impact of correlation and induced correlation on the estimation of project cost of buildings

Author

Listed:
  • Malik Ranasinghe

Abstract

Treatment of correlation between variables is necessary for deriving any theoretical distribution of the project cost of buildings. This paper highlights some often ignored theoretical requirements necessary for a rigorous treatment of correlations. The condition for a positive definite correlation matrix is described, along with an analytical procedure and a computer program developed to verify the positive definite condition when correlation coefficients between input variables are estimated using historical data. The analytical procedure and the developed computer program can be used in any application that obtains correlation information from historical data or as subjective judgements to be used in a functional relationship. A new concept called induced correlation is suggested to define and to treat correlation between derived variables that arise from the common (shared) primary variables in their functional forms. A published numerical example is used to highlight the stages where correlation between variables can have an impact on the estimation of moments (estimated expected value and estimated standard deviation) for the project cost of buildings, and to demonstrate the improvement in the estimation of the standard deviation of project cost as a result of treating correlations in risk analysis.

Suggested Citation

  • Malik Ranasinghe, 2000. "Impact of correlation and induced correlation on the estimation of project cost of buildings," Construction Management and Economics, Taylor & Francis Journals, vol. 18(4), pages 395-406.
  • Handle: RePEc:taf:conmgt:v:18:y:2000:i:4:p:395-406
    DOI: 10.1080/01446190050024815
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190050024815
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190050024815?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. I-Tung Yang, 2006. "Using Gaussian copula to simulate repetitive projects," Construction Management and Economics, Taylor & Francis Journals, vol. 24(9), pages 901-909.
    2. David Hudak & Mark Maxwell, 2007. "A macro approach to estimating correlated random variables in engineering production projects," Construction Management and Economics, Taylor & Francis Journals, vol. 25(8), pages 883-892.
    3. Kim, Byung-Cheol, 2022. "Multi-factor dependence modelling with specified marginals and structured association in large-scale project risk assessment," European Journal of Operational Research, Elsevier, vol. 296(2), pages 679-695.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:18:y:2000:i:4:p:395-406. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.