IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v17y1999i1p45-52.html
   My bibliography  Save this article

Productivity rates and construction methods for high rise concrete construction: a comparative evaluation of UK, German and French contractors

Author

Listed:
  • D. G. Proverbs
  • G. D. Holt
  • P. O. Olomolaiye

Abstract

Recent investigations concerning the productivity of the UK construction industry and its performance compared with other European and world-wide nations have reported conflicting findings. These investigations have utilized various methodologies in attempting to measure and compare productivity levels. The present investigation uses a customized method to gauge the productivity at site level of three European national construction industries, namely Germany, France and the UK. Analysis of variance is employed to compare the productivity rates used by contractors' planning engineers for a specific concreting operation. The performance of UK contractors is found to be more disparate than those of contractors in either France or Germany. Although leading UK contractors can compete with the best on the continent, there are a number of companies whose performance is far worse than any in France and Germany, due mainly to the construction methods used by UK contractors. It is concluded therefore, that a best practice recommenda9 tion for UK contractors would be for them to avoid using traditional timber formwork methods to beams, and instead adopt more productive approaches afforded using either proprietary or prefabricated systems.

Suggested Citation

  • D. G. Proverbs & G. D. Holt & P. O. Olomolaiye, 1999. "Productivity rates and construction methods for high rise concrete construction: a comparative evaluation of UK, German and French contractors," Construction Management and Economics, Taylor & Francis Journals, vol. 17(1), pages 45-52.
  • Handle: RePEc:taf:conmgt:v:17:y:1999:i:1:p:45-52
    DOI: 10.1080/014461999371817
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/014461999371817
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/014461999371817?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Luong Hai Nguyen & Tsunemi Watanabe, 2017. "The Impact of Project Organizational Culture on the Performance of Construction Projects," Sustainability, MDPI, vol. 9(5), pages 1-21, May.
    2. Md. Aslam Hossain & Altynay Zhumabekova & Suvash Chandra Paul & Jong Ryeol Kim, 2020. "A Review of 3D Printing in Construction and its Impact on the Labor Market," Sustainability, MDPI, vol. 12(20), pages 1-21, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:17:y:1999:i:1:p:45-52. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.