IDEAS home Printed from https://ideas.repec.org/a/spr/waterr/v32y2018i12d10.1007_s11269-018-2037-y.html
   My bibliography  Save this article

HHM- and RFRM-Based Water Resource System Risk Identification

Author

Listed:
  • Qiuxiang Jiang

    (Northeast Agricultural University)

  • Tian Wang

    (Northeast Agricultural University)

  • Zilong Wang

    (Northeast Agricultural University)

  • Qiang Fu

    (Northeast Agricultural University)

  • Zhimei Zhou

    (Northeast Agricultural University)

  • Youzhu Zhao

    (Northeast Agricultural University)

  • Yujie Dong

    (Northeast Agricultural University)

Abstract

In water resource system risk research, the risk identification problem should be addressed first, due to its significant impact on risk evaluation and management. Conventional risk identification methods are static and one-sided and are likely to induce problems such as ignored risk sources and ambiguous relationships among sub-systems. Hierarchical holographic modelling (HHM) and Risk filtering, ranking, and management (RFRM) were employed to identify the risk of water resources system. Firstly, water resource systems are divided into 11 major hierarchies and 39 graded holographic sub-subsystems by using the HHM framework. Iteration was applied on 4 graded holographic sub-subsystems, which were decomposed from water resource system in the time-space domain, to accurately identify 30 initial scenarios. Then, on the basis of RFRM theory, the risk probabilities of the initial scenarios are calculated and ranked, and 13 high risk scenarios are identified. Finally, the quantifiable 33 risk indicators that characterize the risk scenario are presented. Research results show that the risks affecting the water resources system include the composition, quantity, quality, and management of water resources, which involve many factors such as hydrology, human resources, resource allocation, and safety. Additionally, the study gives quantitative indicators for responding to high-risk scenarios to ensure that high-risk scenarios are addressed first, which is significant for the subsequent evaluation and management of water resource system risk.

Suggested Citation

  • Qiuxiang Jiang & Tian Wang & Zilong Wang & Qiang Fu & Zhimei Zhou & Youzhu Zhao & Yujie Dong, 2018. "HHM- and RFRM-Based Water Resource System Risk Identification," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 32(12), pages 4045-4061, September.
  • Handle: RePEc:spr:waterr:v:32:y:2018:i:12:d:10.1007_s11269-018-2037-y
    DOI: 10.1007/s11269-018-2037-y
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s11269-018-2037-y
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s11269-018-2037-y?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. M.-Elisabeth Paté-Cornell & Paul S. Fischbeck, 1994. "Risk Management for the Tiles of the Space Shuttle," Interfaces, INFORMS, vol. 24(1), pages 64-86, February.
    2. Agathoklis Agathokleous & Chrystalleni Christodoulou & Symeon E. Christodoulou, 2017. "Topological Robustness and Vulnerability Assessment of Water Distribution Networks," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 31(12), pages 4007-4021, September.
    3. Stanley Kaplan & B. John Garrick, 1981. "On The Quantitative Definition of Risk," Risk Analysis, John Wiley & Sons, vol. 1(1), pages 11-27, March.
    4. P. Mujumdar & B. Nirmala, 2007. "A Bayesian Stochastic Optimization Model for a Multi-Reservoir Hydropower System," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 21(9), pages 1465-1485, September.
    5. Wouter Buytaert & Jan Friesen & Jens Liebe & Ralf Ludwig, 2012. "Assessment and Management of Water Resources in Developing, Semi-arid and Arid Regions," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 26(4), pages 841-844, March.
    6. Ahmed Said, 2006. "The Implementation of a Bayesian Network for Watershed Management Decisions," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 20(4), pages 591-605, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Manby, Bronwen, 2021. "The Sustainable Development Goals and ‘legal identity for all’: ‘First, do no harm’," World Development, Elsevier, vol. 139(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. S. Cucurachi & E. Borgonovo & R. Heijungs, 2016. "A Protocol for the Global Sensitivity Analysis of Impact Assessment Models in Life Cycle Assessment," Risk Analysis, John Wiley & Sons, vol. 36(2), pages 357-377, February.
    2. Chen, Fuzhong & Hsu, Chien-Lung & Lin, Arthur J. & Li, Haifeng, 2020. "Holding risky financial assets and subjective wellbeing: Empirical evidence from China," The North American Journal of Economics and Finance, Elsevier, vol. 54(C).
    3. Niël Almero Krüger & Natanya Meyer, 2021. "The Development of a Small and Medium-Sized Business Risk Management Intervention Tool," JRFM, MDPI, vol. 14(7), pages 1-14, July.
    4. Johnson, Caroline A. & Flage, Roger & Guikema, Seth D., 2021. "Feasibility study of PRA for critical infrastructure risk analysis," Reliability Engineering and System Safety, Elsevier, vol. 212(C).
    5. Kasai, Naoya & Matsuhashi, Shigemi & Sekine, Kazuyoshi, 2013. "Accident occurrence model for the risk analysis of industrialfacilities," Reliability Engineering and System Safety, Elsevier, vol. 114(C), pages 71-74.
    6. J. C. Helton & F. J. Davis, 2002. "Illustration of Sampling‐Based Methods for Uncertainty and Sensitivity Analysis," Risk Analysis, John Wiley & Sons, vol. 22(3), pages 591-622, June.
    7. Michael Greenberg & Paul Lioy & Birnur Ozbas & Nancy Mantell & Sastry Isukapalli & Michael Lahr & Tayfur Altiok & Joseph Bober & Clifton Lacy & Karen Lowrie & Henry Mayer & Jennifer Rovito, 2013. "Passenger Rail Security, Planning, and Resilience: Application of Network, Plume, and Economic Simulation Models as Decision Support Tools," Risk Analysis, John Wiley & Sons, vol. 33(11), pages 1969-1986, November.
    8. Felipe Aguirre & Mohamed Sallak & Walter Schön & Fabien Belmonte, 2013. "Application of evidential networks in quantitative analysis of railway accidents," Journal of Risk and Reliability, , vol. 227(4), pages 368-384, August.
    9. Yacov Y. Haimes, 2012. "Systems‐Based Guiding Principles for Risk Modeling, Planning, Assessment, Management, and Communication," Risk Analysis, John Wiley & Sons, vol. 32(9), pages 1451-1467, September.
    10. Zio, E., 2018. "The future of risk assessment," Reliability Engineering and System Safety, Elsevier, vol. 177(C), pages 176-190.
    11. Julie E. Shortridge & Benjamin F. Zaitchik, 2018. "Characterizing climate change risks by linking robust decision frameworks and uncertain probabilistic projections," Climatic Change, Springer, vol. 151(3), pages 525-539, December.
    12. Lisicki, Michal & Lubitz, William & Taylor, Graham W., 2016. "Optimal design and operation of Archimedes screw turbines using Bayesian optimization," Applied Energy, Elsevier, vol. 183(C), pages 1404-1417.
    13. Qiao-feng Tan & Guo-hua Fang & Xin Wen & Xiao-hui Lei & Xu Wang & Chao Wang & Yi Ji, 2020. "Bayesian Stochastic Dynamic Programming for Hydropower Generation Operation Based on Copula Functions," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 34(5), pages 1589-1607, March.
    14. Wenlan Ke & Jinghua Sha & Jingjing Yan & Guofeng Zhang & Rongrong Wu, 2016. "A Multi-Objective Input–Output Linear Model for Water Supply, Economic Growth and Environmental Planning in Resource-Based Cities," Sustainability, MDPI, vol. 8(2), pages 1-18, February.
    15. Yacov Y. Haimes, 2006. "On the Definition of Vulnerabilities in Measuring Risks to Infrastructures," Risk Analysis, John Wiley & Sons, vol. 26(2), pages 293-296, April.
    16. Angelo Panno & Annalisa Theodorou & Giuseppe Alessio Carbone & Evelina De Longis & Chiara Massullo & Gianluca Cepale & Giuseppe Carrus & Claudio Imperatori & Giovanni Sanesi, 2021. "Go Greener, Less Risk: Access to Nature Is Associated with Lower Risk Taking in Different Domains during the COVID-19 Lockdown," Sustainability, MDPI, vol. 13(19), pages 1-17, September.
    17. Peng Ye, 2022. "Remote Sensing Approaches for Meteorological Disaster Monitoring: Recent Achievements and New Challenges," IJERPH, MDPI, vol. 19(6), pages 1-28, March.
    18. Denitsa Angelova & Andrea Bigano & Francesco Bosello & Shouro Dasgupta & Silvio Giove, 2023. "Assessing systemic climate change risk by country. Reflections from the use of composite indicators," Working Papers 2023: 28, Department of Economics, University of Venice "Ca' Foscari".
    19. Agnieszka A. Tubis & Emilia T. Skupień & Stefan Jankowski & Jacek Ryczyński, 2022. "Risk Assessment of Human Factors of Logistic Handling of Deliveries at an LNG Terminal," Energies, MDPI, vol. 15(8), pages 1-24, April.
    20. Ioanna Ioannou & Jaime E. Cadena & Willy Aspinall & David Lange & Daniel Honfi & Tiziana Rossetto, 2022. "Prioritization of hazards for risk and resilience management through elicitation of expert judgement," Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards, Springer;International Society for the Prevention and Mitigation of Natural Hazards, vol. 112(3), pages 2773-2795, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:waterr:v:32:y:2018:i:12:d:10.1007_s11269-018-2037-y. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.