An inventory model for imperfect quality items considering learning effects and partial trade credit policy
Author
Abstract
Suggested Citation
DOI: 10.1007/s12597-022-00602-3
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Ouyang, Liang-Yuh & Chang, Chun-Tao, 2013. "Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging," International Journal of Production Economics, Elsevier, vol. 144(2), pages 610-617.
- Khan, M. & Jaber, M.Y. & Wahab, M.I.M., 2010. "Economic order quantity model for items with imperfect quality with learning in inspection," International Journal of Production Economics, Elsevier, vol. 124(1), pages 87-96, March.
- Chandan Mahato & Gour Chandra Mahata, 2021. "Optimal inventory policies for deteriorating items with expiration date and dynamic demand under two-level trade credit," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 994-1017, December.
- Sarkar, Biswajit & Saren, Sharmila, 2016. "Product inspection policy for an imperfect production system with inspection errors and warranty cost," European Journal of Operational Research, Elsevier, vol. 248(1), pages 263-271.
- Alberto Cambini & Laura Martein, 2009. "Generalized Convexity and Optimization," Lecture Notes in Economics and Mathematical Systems, Springer, number 978-3-540-70876-6, July.
- Chang, Chun-Tao & Ouyang, Liang-Yuh & Teng, Jinn-Tsair & Lai, Kuei-Kuei & Cárdenas-Barrón, Leopoldo Eduardo, 2019. "Manufacturer's pricing and lot-sizing decisions for perishable goods under various payment terms by a discounted cash flow analysis," International Journal of Production Economics, Elsevier, vol. 218(C), pages 83-95.
- Wu, Jiang & Chan, Ya-Lan, 2014. "Lot-sizing policies for deteriorating items with expiration dates and partial trade credit to credit-risk customers," International Journal of Production Economics, Elsevier, vol. 155(C), pages 292-301.
- Tiwari, Sunil & Kazemi, Nima & Modak, Nikunja Mohan & Cárdenas-Barrón, Leopoldo Eduardo & Sarkar, Sumon, 2020. "The effect of human errors on an integrated stochastic supply chain model with setup cost reduction and backorder price discount," International Journal of Production Economics, Elsevier, vol. 226(C).
- Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2009. "Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return," International Journal of Production Economics, Elsevier, vol. 121(1), pages 255-265, September.
- Teng, Jinn-Tsair, 2009. "Optimal ordering policies for a retailer who offers distinct trade credits to its good and bad credit customers," International Journal of Production Economics, Elsevier, vol. 119(2), pages 415-423, June.
- Rad, M. A. & Khoshalhan, F. & Glock, C. H., 2018. "Optimal production and distribution policies for a two-stage supply chain with imperfect items and price- and advertisement-sensitive demand: A note," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 84500, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Salameh, M. K. & Jaber, M. Y., 2000. "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 59-64, March.
- Archana Sharma & Usha Sharma & Chaman Singh, 2018. "An analysis of replenishment model of deteriorating items with ramp-type demand and trade credit under the learning effect," International Journal of Procurement Management, Inderscience Enterprises Ltd, vol. 11(3), pages 313-342.
- Mahesh Kumar Jayaswal & Mandeep Mittal & Isha Sangal, 2021. "Ordering policies for deteriorating imperfect quality items with trade-credit financing under learning effect," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 12(1), pages 112-125, February.
- Lie-Fern Hsu & Jia-Tzer Hsu, 2016. "Economic production quantity (EPQ) models under an imperfect production process with shortages backordered," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(4), pages 852-867, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hui-Ling Yang & Chun-Tao Chang & Yao-Ting Tseng, 2024. "Optimal Replenishment Strategy for a High-Tech Product Demand with Non-Instantaneous Deterioration under an Advance-Cash-Credit Payment Scheme by a Discounted Cash-Flow Analysis," Mathematics, MDPI, vol. 12(19), pages 1-25, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Aditi Khanna & Aakanksha Kishore & Biswajit Sarkar & Chandra K. Jaggi, 2018. "Supply Chain with Customer-Based Two-Level Credit Policies under an Imperfect Quality Environment," Mathematics, MDPI, vol. 6(12), pages 1-35, December.
- Leopoldo Eduardo Cárdenas-Barrón & María José Lea Plaza-Makowsky & María Alejandra Sevilla-Roca & José María Núñez-Baumert & Buddhadev Mandal, 2021. "An Inventory Model for Imperfect Quality Products with Rework, Distinct Holding Costs, and Nonlinear Demand Dependent on Price," Mathematics, MDPI, vol. 9(12), pages 1-20, June.
- Bikash Koli Dey & Hyesung Seok, 2024. "Intelligent inventory management with autonomation and service strategy," Journal of Intelligent Manufacturing, Springer, vol. 35(1), pages 307-330, January.
- Ivan Darma Wangsa & Hui Ming Wee & Shih-Hsien Tseng, 2019. "A coordinated vendor–buyer system considering loss and damage claims, insurance cost and stochastic lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 384-398, June.
- Chen, Sheng-Chih & Teng, Jinn-Tsair & Skouri, Konstantina, 2014. "Economic production quantity models for deteriorating items with up-stream full trade credit and down-stream partial trade credit," International Journal of Production Economics, Elsevier, vol. 155(C), pages 302-309.
- Mohsen Lashgari & Ata Allah Taleizadeh & Abbas Ahmadi, 2016. "Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain," Annals of Operations Research, Springer, vol. 238(1), pages 329-354, March.
- Javad Asadkhani & Hadi Mokhtari & Saman Tahmasebpoor, 2022. "Optimal lot-sizing under learning effect in inspection errors with different types of imperfect quality items," Operational Research, Springer, vol. 22(3), pages 2631-2665, July.
- Chandan Mahato & Gour Chandra Mahata, 2023. "Optimal ordering policy under order-size dependent trade credit and complete backlogging derived algebraically," OPSEARCH, Springer;Operational Research Society of India, vol. 60(1), pages 420-444, March.
- Shi, Yan & Zhang, Zhiyong & Chen, Sheng-Chih & Cárdenas-Barrón, Leopoldo Eduardo & Skouri, Konstantina, 2020. "Optimal replenishment decisions for perishable products under cash, advance, and credit payments considering carbon tax regulations," International Journal of Production Economics, Elsevier, vol. 223(C).
- Wu, Jiang & Ouyang, Liang-Yuh & Cárdenas-Barrón, Leopoldo Eduardo & Goyal, Suresh Kumar, 2014. "Optimal credit period and lot size for deteriorating items with expiration dates under two-level trade credit financing," European Journal of Operational Research, Elsevier, vol. 237(3), pages 898-908.
- Yan Shi & Zhiyong Zhang & Sunil Tiwari & Zhiwen Tao, 2022. "Retailer's optimal strategy for a perishable product with increasing demand under various payment schemes," Annals of Operations Research, Springer, vol. 315(2), pages 899-929, August.
- Adel A. Alamri, 2023. "Carbon Emissions Effect on Vendor-Managed Inventory System Considering Displaced Re-Start-Up Production Time," Logistics, MDPI, vol. 7(4), pages 1-29, September.
- Chun-Tao Chang & Yao-Ting Tseng, 2024. "The Impacts of Payment Schemes and Carbon Emission Policies on Replenishment and Pricing Decisions for Perishable Products in a Supply Chain," Mathematics, MDPI, vol. 12(7), pages 1-24, March.
- Ata Allah Taleizadeh & Sara Tavassoli & Arijit Bhattacharya, 2020. "Inventory ordering policies for mixed sale of products under inspection policy, multiple prepayment, partial trade credit, payments linked to order quantity and full backordering," Annals of Operations Research, Springer, vol. 287(1), pages 403-437, April.
- Taleizadeh, Ata Allah & Khanbaglo, Mahboobeh Perak Sari & Cárdenas-Barrón, Leopoldo Eduardo, 2016. "An EOQ inventory model with partial backordering and reparation of imperfect products," International Journal of Production Economics, Elsevier, vol. 182(C), pages 418-434.
- Ruihai Li & Jinn-Tsair Teng & Chun-Tao Chang, 2021. "Lot-sizing and pricing decisions for perishable products under three-echelon supply chains when demand depends on price and stock-age," Annals of Operations Research, Springer, vol. 307(1), pages 303-328, December.
- Chayanika Rout & Ravi Shankar Kumar & Debjani Chakraborty & Adrijit Goswami, 2019. "An EPQ model for deteriorating items with imperfect production, inspection errors, rework and shortages : a type-2 fuzzy approach," OPSEARCH, Springer;Operational Research Society of India, vol. 56(3), pages 657-688, September.
- Wu, Jiang & Al-khateeb, Faisal B. & Teng, Jinn-Tsair & Cárdenas-Barrón, Leopoldo Eduardo, 2016. "Inventory models for deteriorating items with maximum lifetime under downstream partial trade credits to credit-risk customers by discounted cash-flow analysis," International Journal of Production Economics, Elsevier, vol. 171(P1), pages 105-115.
- Khan, M. & Jaber, M.Y. & Guiffrida, A.L. & Zolfaghari, S., 2011. "A review of the extensions of a modified EOQ model for imperfect quality items," International Journal of Production Economics, Elsevier, vol. 132(1), pages 1-12, July.
- Mohsen Lashgari & Ata Taleizadeh & Abbas Ahmadi, 2016. "Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain," Annals of Operations Research, Springer, vol. 238(1), pages 329-354, March.
More about this item
Keywords
Imperfect production; Inspection error; Inspector learning; Trade credit; Promotional effort;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:opsear:v:60:y:2023:i:1:d:10.1007_s12597-022-00602-3. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.