On the estimation of data parameters for economic optimum 135-1135-1135-1-Charts
Author
Abstract
Suggested Citation
DOI: 10.1007/BF01902858
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Douglas C. Montgomery & Phillip J. Klatt, 1972. "Economic Design of T 2 Control Charts to Maintain Current Control of a Process," Management Science, INFORMS, vol. 19(1), pages 76-89, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Turnes Osiris & Lee Ho Linda & Imaña Christian Rainier, 2002. "Comparison of Semi-Economic and -R Control Charts for Non-Ageing and Ageing Process," Stochastics and Quality Control, De Gruyter, vol. 17(1), pages 99-112, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Liang Liu & Cong Feng & Hongwei Zhang & Xuehua Zhang, 2015. "Game Analysis and Simulation of the River Basin Sustainable Development Strategy Integrating Water Emission Trading," Sustainability, MDPI, vol. 7(5), pages 1-21, April.
- Yang, S.F. & Rahim, M.A., 2005. "Economic statistical process control for multivariate quality characteristics under Weibull shock model," International Journal of Production Economics, Elsevier, vol. 98(2), pages 215-226, November.
- Asghar Seif & Alireza Faraz & C�dric Heuchenne & Erwin Saniga & M. B. Moghadam, 2011. "A modified economic-statistical design of the T-super-2 control chart with variable sample sizes and control limits," Journal of Applied Statistics, Taylor & Francis Journals, vol. 38(11), pages 2459-2469, January.
- Xiao, Xiao & Jiang, Wei & Luo, Jianwen, 2019. "Combining process and product information for quality improvement," International Journal of Production Economics, Elsevier, vol. 207(C), pages 130-143.
- Jolayemi, Joel K., 1995. "A power function model for determining sample sizes for the operations of multivariate control charts," Computational Statistics & Data Analysis, Elsevier, vol. 20(6), pages 633-641, December.
- Yan-Kwang Chen, 2009. "Economic design of T 2 control charts with the VSSI sampling scheme," Quality & Quantity: International Journal of Methodology, Springer, vol. 43(1), pages 109-122, January.
- Wu, Jianmou & Makis, Viliam, 2008. "Economic and economic-statistical design of a chi-square chart for CBM," European Journal of Operational Research, Elsevier, vol. 188(2), pages 516-529, July.
- Y-K Chen, 2007. "Economic design of an adaptive T 2 control chart," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(3), pages 337-345, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:metrik:v:23:y:1976:i:1:p:135-147. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.