IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v19y1972i1p76-89.html
   My bibliography  Save this article

Economic Design of T 2 Control Charts to Maintain Current Control of a Process

Author

Listed:
  • Douglas C. Montgomery

    (Georgia Institute of Technology)

  • Phillip J. Klatt

    (Georgia Institute of Technology)

Abstract

An approximate cost model for a quality control procedure for two or more related variables is investigated. A method is presented to determine the optimal sample size, interval between samples, and critical region parameter for the Hotelling T 2 control chart. This model is a multivariate analog of several well-known models for the univariate X\bar -chart. It is assumed that only one assignable cause of variation exists and the time between occurrences is exponentially distributed. Numerical results are provided in a particular bivariate case for several values of the cost coefficients. The behavior of the model to variation of the model parameters is discussed.

Suggested Citation

  • Douglas C. Montgomery & Phillip J. Klatt, 1972. "Economic Design of T 2 Control Charts to Maintain Current Control of a Process," Management Science, INFORMS, vol. 19(1), pages 76-89, September.
  • Handle: RePEc:inm:ormnsc:v:19:y:1972:i:1:p:76-89
    DOI: 10.1287/mnsc.19.1.76
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.19.1.76
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.19.1.76?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. W. Chiu, 1976. "On the estimation of data parameters for economic optimum 135-1135-1135-1-Charts," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 23(1), pages 135-147, December.
    2. Liang Liu & Cong Feng & Hongwei Zhang & Xuehua Zhang, 2015. "Game Analysis and Simulation of the River Basin Sustainable Development Strategy Integrating Water Emission Trading," Sustainability, MDPI, vol. 7(5), pages 1-21, April.
    3. Wu, Jianmou & Makis, Viliam, 2008. "Economic and economic-statistical design of a chi-square chart for CBM," European Journal of Operational Research, Elsevier, vol. 188(2), pages 516-529, July.
    4. Yang, S.F. & Rahim, M.A., 2005. "Economic statistical process control for multivariate quality characteristics under Weibull shock model," International Journal of Production Economics, Elsevier, vol. 98(2), pages 215-226, November.
    5. Asghar Seif & Alireza Faraz & C�dric Heuchenne & Erwin Saniga & M. B. Moghadam, 2011. "A modified economic-statistical design of the T-super-2 control chart with variable sample sizes and control limits," Journal of Applied Statistics, Taylor & Francis Journals, vol. 38(11), pages 2459-2469, January.
    6. Y-K Chen, 2007. "Economic design of an adaptive T 2 control chart," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(3), pages 337-345, March.
    7. Xiao, Xiao & Jiang, Wei & Luo, Jianwen, 2019. "Combining process and product information for quality improvement," International Journal of Production Economics, Elsevier, vol. 207(C), pages 130-143.
    8. Jolayemi, Joel K., 1995. "A power function model for determining sample sizes for the operations of multivariate control charts," Computational Statistics & Data Analysis, Elsevier, vol. 20(6), pages 633-641, December.
    9. Yan-Kwang Chen, 2009. "Economic design of T 2 control charts with the VSSI sampling scheme," Quality & Quantity: International Journal of Methodology, Springer, vol. 43(1), pages 109-122, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:19:y:1972:i:1:p:76-89. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.