Konzeption eines aktivitätsorientierten Instruments zur Anlaufkostenplanung
Author
Abstract
Suggested Citation
DOI: 10.1007/s00187-008-0043-6
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Carrillo, Janice E. & Franza, Richard M., 2006. "Investing in product development and production capabilities: The crucial linkage between time-to-market and ramp-up time," European Journal of Operational Research, Elsevier, vol. 171(2), pages 536-556, June.
- Ben-Arieh, David & Qian, Li, 2003. "Activity-based cost management for design and development stage," International Journal of Production Economics, Elsevier, vol. 83(2), pages 169-183, February.
- Terwiesch, Christian & E. Bohn, Roger, 2001. "Learning and process improvement during production ramp-up," International Journal of Production Economics, Elsevier, vol. 70(1), pages 1-19, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Weckenborg, Christian & Schumacher, Patrick & Thies, Christian & Spengler, Thomas S., 2024. "Flexibility in manufacturing system design: A review of recent approaches from Operations Research," European Journal of Operational Research, Elsevier, vol. 315(2), pages 413-441.
- Annika Becker & Raik Stolletz & Thomas Stäblein, 2017. "Strategic ramp-up planning in automotive production networks," International Journal of Production Research, Taylor & Francis Journals, vol. 55(1), pages 59-78, January.
- Doltsinis, Stefanos C. & Ratchev, Svetan & Lohse, Niels, 2013. "A framework for performance measurement during production ramp-up of assembly stations," European Journal of Operational Research, Elsevier, vol. 229(1), pages 85-94.
- Paulson Gjerde, Kathy A. & Slotnick, Susan A., 2004. "Quality and reputation: The effects of external and internal factors over time," International Journal of Production Economics, Elsevier, vol. 89(1), pages 1-20, May.
- Agathe Gilain & Pascal Le Masson & Benoit Weil, 2018. "Managing Learning Curves In The Unknown: From ‘Learning By Doing’ To ‘Learning By Designing’," Post-Print hal-01900961, HAL.
- Thyssen, Jesper & Israelsen, Poul & Jorgensen, Brian, 2006. "Activity-based costing as a method for assessing the economics of modularization--A case study and beyond," International Journal of Production Economics, Elsevier, vol. 103(1), pages 252-270, September.
- Fabio Magnacca & Riccardo Giannetti, 2024. "Management accounting and new product development: a systematic literature review and future research directions," Journal of Management & Governance, Springer;Accademia Italiana di Economia Aziendale (AIDEA), vol. 28(2), pages 651-685, June.
- S. Göttlich & S. Kühn & J. A. Schwarz & R. Stolletz, 2016. "Approximations of time-dependent unreliable flow lines with finite buffers," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 83(3), pages 295-323, June.
- Leachman, Robert C. & Ding, Shengwei, 2007. "Integration of speed economics into decision-making for manufacturing management," International Journal of Production Economics, Elsevier, vol. 107(1), pages 39-55, May.
- Tolonen, Arto & Haapasalo, Harri & Harkonen, Janne & Verrollot, Jordan, 2017. "Supply chain capability creation – The creation of the supply chain readiness for a new product during product development process," International Journal of Production Economics, Elsevier, vol. 194(C), pages 237-245.
- Ozer, Muammer, 2007. "Reducing the demand uncertainties at the fuzzy-front-end of developing new online services," Research Policy, Elsevier, vol. 36(9), pages 1372-1387, November.
- Askarany, Davood & Yazdifar, Hassan, 2012. "An investigation into the mixed reported adoption rates for ABC: Evidence from Australia, New Zealand and the UK," International Journal of Production Economics, Elsevier, vol. 135(1), pages 430-439.
- Li, Yuan & Wei, Zelong & Zhao, Jie & Zhang, Chenlu & Liu, Yi, 2013. "Ambidextrous organizational learning, environmental munificence and new product performance: Moderating effect of managerial ties in China," International Journal of Production Economics, Elsevier, vol. 146(1), pages 95-105.
- Manda, A.B. & Uzsoy, Reha, 2021. "Managing product transitions with learning and congestion effects," International Journal of Production Economics, Elsevier, vol. 239(C).
- Emmanouil Tziolas & Stefanos Ispikoudis & Konstantinos Mantzanas & Dimitrios Koutsoulis & Anastasia Pantera, 2022. "Economic and Environmental Assessment of Olive Agroforestry Practices in Northern Greece," Agriculture, MDPI, vol. 12(6), pages 1-15, June.
- Bonnin Roca, Jaime & O'Sullivan, Eoin, 2020. "Seeking coherence between barriers to manufacturing technology adoption and innovation policy," International Journal of Production Economics, Elsevier, vol. 230(C).
- Gülru F. Özkan-Seely & Cheryl Gaimon & Stylianos Kavadias, 2015. "Dynamic Knowledge Transfer and Knowledge Development for Product and Process Design Teams," Manufacturing & Service Operations Management, INFORMS, vol. 17(2), pages 177-190, May.
- Qian, Li & Ben-Arieh, David, 2008. "Parametric cost estimation based on activity-based costing: A case study for design and development of rotational parts," International Journal of Production Economics, Elsevier, vol. 113(2), pages 805-818, June.
- Duffner, Fabian & Mauler, Lukas & Wentker, Marc & Leker, Jens & Winter, Martin, 2021. "Large-scale automotive battery cell manufacturing: Analyzing strategic and operational effects on manufacturing costs," International Journal of Production Economics, Elsevier, vol. 232(C).
- Morgan, Horatio M. & Ngwenyama, Ojelanki, 2015. "Real options, learning cost and timing software upgrades: Towards an integrative model for enterprise software upgrade decision analysis," International Journal of Production Economics, Elsevier, vol. 168(C), pages 211-223.
More about this item
Keywords
Anlauf; Anlaufkostenplanung; Prozesskosten; Kennzahlen; Ramp-up; Ramp-up cost planning; Activity-based costs; Metrics;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:metrik:v:19:y:2008:i:1:p:85-106. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.