IDEAS home Printed from https://ideas.repec.org/a/spr/mathme/v60y2004i3p497-521.html
   My bibliography  Save this article

Dynamic inventory strategies for profit maximization in a service facility with stochastic service, demand and lead time

Author

Listed:
  • Oded Berman
  • Eungab Kim

Abstract

This paper addresses an optimal inventory control in a supply chain in which customers arrive at a facility according to a Poisson process and the facility provides service which takes exponential amounts of time, using items supplied by an outside supplier with exponential lead time process. Formulating our model as a Markov decision problem, we identify a replenishment policy which maximizes the facility’s profit subject to the costs of service delay, inventory holding, and replenishment setup and analytically examine how the changes in system parameters affect the optimal profit and the optimal replenishment policy. We show that these results can be extended to Erlang lead time process. We present numerical study for the optimal performance evaluation and comparison of the optimal replenishment policy with (Q,r) policy. Copyright Springer-Verlag 2004

Suggested Citation

  • Oded Berman & Eungab Kim, 2004. "Dynamic inventory strategies for profit maximization in a service facility with stochastic service, demand and lead time," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 60(3), pages 497-521, December.
  • Handle: RePEc:spr:mathme:v:60:y:2004:i:3:p:497-521
    DOI: 10.1007/s001860400369
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1007/s001860400369
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1007/s001860400369?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Sha, Yue & Zhang, Junlong & Cao, Hui, 2021. "Multistage stochastic programming approach for joint optimization of job scheduling and material ordering under endogenous uncertainties," European Journal of Operational Research, Elsevier, vol. 290(3), pages 886-900.
    2. Song, Dong-Ping & Dong, Jing-Xin & Xu, Jingjing, 2014. "Integrated inventory management and supplier base reduction in a supply chain with multiple uncertainties," European Journal of Operational Research, Elsevier, vol. 232(3), pages 522-536.
    3. Jeganathan, K. & Abdul Reiyas, M. & Prasanna Lakshmi, K. & Saravanan, S., 2019. "Two server Markovian inventory systems with server interruptions: Heterogeneous vs. homogeneous servers," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 155(C), pages 177-200.
    4. Maike Schwarz & Hans Daduna, 2006. "Queueing systems with inventory management with random lead times and with backordering," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 64(3), pages 383-414, December.
    5. A. Krishnamoorthy & R. Manikandan & B. Lakshmy, 2015. "A revisit to queueing-inventory system with positive service time," Annals of Operations Research, Springer, vol. 233(1), pages 221-236, October.
    6. Zhao, Ning & Lian, Zhaotong, 2011. "A queueing-inventory system with two classes of customers," International Journal of Production Economics, Elsevier, vol. 129(1), pages 225-231, January.
    7. Jalili Marand, Ata & Li, Hongyan & Thorstenson, Anders, 2019. "Joint inventory control and pricing in a service-inventory system," International Journal of Production Economics, Elsevier, vol. 209(C), pages 78-91.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:mathme:v:60:y:2004:i:3:p:497-521. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.