IDEAS home Printed from https://ideas.repec.org/a/spr/jsched/v24y2021i6d10.1007_s10951-021-00702-w.html
   My bibliography  Save this article

Three notes on scheduling unit-length jobs with precedence constraints to minimize the total completion time

Author

Listed:
  • Tianyu Wang

    (Beihang University)

  • Odile Bellenguez

    (LS2N, La Chantrerie)

Abstract

In this paper, we provide three notes on scheduling unit-length jobs with precedence constraints to minimize the total completion time. First, we propose an exact algorithm for in-trees, of which the complexity depends mainly on the graph height, i.e., the length of the longest chain of the precedence graph. We show that this work improves the algorithm in the literature both theoretically and experimentally. Second, we close the open problem for level-orders by showing how it is polynomially solvable. Third, we prove that preemptive scheduling in-trees is strongly NP-hard with arbitrary number of machines, of which the complexity was also open.

Suggested Citation

  • Tianyu Wang & Odile Bellenguez, 2021. "Three notes on scheduling unit-length jobs with precedence constraints to minimize the total completion time," Journal of Scheduling, Springer, vol. 24(6), pages 649-662, December.
  • Handle: RePEc:spr:jsched:v:24:y:2021:i:6:d:10.1007_s10951-021-00702-w
    DOI: 10.1007/s10951-021-00702-w
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10951-021-00702-w
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10951-021-00702-w?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Tianyu Wang & Odile Bellenguez-Morineau, 2019. "A complexity analysis of parallel scheduling unit-time jobs with in-tree precedence constraints while minimizing the mean flow time," Journal of Scheduling, Springer, vol. 22(6), pages 709-714, December.
    2. Bo Chen & Ed Coffman & Dariusz Dereniowski & Wiesław Kubiak, 2016. "Normal-form preemption sequences for an open problem in scheduling theory," Journal of Scheduling, Springer, vol. 19(6), pages 701-728, December.
    3. D. Prot & O. Bellenguez-Morineau, 2018. "A survey on how the structure of precedence constraints may change the complexity class of scheduling problems," Journal of Scheduling, Springer, vol. 21(1), pages 3-16, February.
    4. Tianyu Wang & Odile Bellenguez-Morineau, 2019. "The Complexity of Parallel Machine Scheduling of Unit-Processing-Time Jobs under Level-Order Precedence Constraints," Journal of Scheduling, Springer, vol. 22(3), pages 263-269, June.
    5. T. C. Hu, 1961. "Parallel Sequencing and Assembly Line Problems," Operations Research, INFORMS, vol. 9(6), pages 841-848, December.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jiang, Xiaojuan & Lee, Kangbok & Pinedo, Michael L., 2021. "Ideal schedules in parallel machine settings," European Journal of Operational Research, Elsevier, vol. 290(2), pages 422-434.
    2. Tianyu Wang & Odile Bellenguez-Morineau, 2019. "The Complexity of Parallel Machine Scheduling of Unit-Processing-Time Jobs under Level-Order Precedence Constraints," Journal of Scheduling, Springer, vol. 22(3), pages 263-269, June.
    3. Jia, Beizhen & Tierney, Kevin & Reinhardt, Line Blander & Pahl, Julia, 2022. "Optimal dual cycling operations in roll-on roll-off terminals," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 159(C).
    4. Tianyu Wang & Odile Bellenguez-Morineau, 2019. "A complexity analysis of parallel scheduling unit-time jobs with in-tree precedence constraints while minimizing the mean flow time," Journal of Scheduling, Springer, vol. 22(6), pages 709-714, December.
    5. Anurag Agarwal & Varghese S. Jacob & Hasan Pirkul, 2006. "An Improved Augmented Neural-Network Approach for Scheduling Problems," INFORMS Journal on Computing, INFORMS, vol. 18(1), pages 119-128, February.
    6. Nodari Vakhania, 2001. "Tight Performance Bounds of CP-Scheduling on Out-Trees," Journal of Combinatorial Optimization, Springer, vol. 5(4), pages 445-464, December.
    7. Ramachandra, Girish & Elmaghraby, Salah E., 2006. "Sequencing precedence-related jobs on two machines to minimize the weighted completion time," International Journal of Production Economics, Elsevier, vol. 100(1), pages 44-58, March.
    8. Ecker, Klaus H., 1999. "Scheduling of resource tasks," European Journal of Operational Research, Elsevier, vol. 115(2), pages 314-327, June.
    9. Xing Chai & Wenhua Li, 2018. "Online scheduling with chain precedence constraints of equal-length jobs on parallel machines to minimize makespan," Journal of Combinatorial Optimization, Springer, vol. 36(2), pages 472-492, August.
    10. Zhang, An & Qi, Xiangtong & Li, Guanhua, 2020. "Machine scheduling with soft precedence constraints," European Journal of Operational Research, Elsevier, vol. 282(2), pages 491-505.
    11. Klaus Heeger & Danny Hermelin & George B. Mertzios & Hendrik Molter & Rolf Niedermeier & Dvir Shabtay, 2023. "Equitable scheduling on a single machine," Journal of Scheduling, Springer, vol. 26(2), pages 209-225, April.
    12. Lenstra, J. K. & Rinnooy Kan, A. H. G., 1980. "An Introduction To Multiprocessor Scheduling," Econometric Institute Archives 272258, Erasmus University Rotterdam.
    13. Luo, Kaiping & Shen, Guangya & Li, Liheng & Sun, Jianfei, 2023. "0-1 mathematical programming models for flexible process planning," European Journal of Operational Research, Elsevier, vol. 308(3), pages 1160-1175.
    14. Timkovsky, Vadim G., 2003. "Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity," European Journal of Operational Research, Elsevier, vol. 149(2), pages 355-376, September.
    15. Mina Roohnavazfar & Seyed Hamid Reza Pasandideh, 2022. "Decomposition algorithm for the multi-trip single vehicle routing problem with AND-type precedence constraints," Operational Research, Springer, vol. 22(4), pages 4253-4285, September.
    16. Andrew Lim & Brian Rodrigues & Zhou Xu, 2007. "A m‐parallel crane scheduling problem with a non‐crossing constraint," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(2), pages 115-127, March.
    17. Finke, Gerd & Lemaire, Pierre & Proth, Jean-Marie & Queyranne, Maurice, 2009. "Minimizing the number of machines for minimum length schedules," European Journal of Operational Research, Elsevier, vol. 199(3), pages 702-705, December.
    18. Blazewicz, Jacek & Liu, Zhen, 2002. "Linear and quadratic algorithms for scheduling chains and opposite chains," European Journal of Operational Research, Elsevier, vol. 137(2), pages 248-264, March.
    19. D. Prot & O. Bellenguez-Morineau, 2018. "A survey on how the structure of precedence constraints may change the complexity class of scheduling problems," Journal of Scheduling, Springer, vol. 21(1), pages 3-16, February.
    20. Felix Happach, 2021. "Makespan minimization with OR-precedence constraints," Journal of Scheduling, Springer, vol. 24(3), pages 319-328, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:jsched:v:24:y:2021:i:6:d:10.1007_s10951-021-00702-w. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.