IDEAS home Printed from https://ideas.repec.org/a/spr/jcomop/v43y2022i5d10.1007_s10878-020-00654-5.html
   My bibliography  Save this article

Single machine lot scheduling with non-uniform lot capacities and processing times

Author

Listed:
  • Ying Chen

    (Xi’an Jiaotong University)

  • Yongxi Cheng

    (Xi’an Jiaotong University
    State Key Lab for Manufacturing Systems Engineering)

  • Guiqing Zhang

    (Xi’an Jiaotong University)

Abstract

In this paper, we investigate the single machine lot scheduling problem in which each lot contains one or more jobs (or part of jobs). Jobs with different sizes are splittable and should be processed in consecutive lots. Any completed (part of a) job is delivered to the customer on its completion. We generalize the problem studied in Zhang et al. (Inf Process Lett 142:46–51, 2019) such that lots may have different capacities and processing times, and the sizes of jobs are unbounded. We show that for this generalized case, the WSPT (Weighted Shortest Processing Time first) rule is still optimal for both minimizing total weighted completion time and minimizing total weighted discounted completion time.

Suggested Citation

  • Ying Chen & Yongxi Cheng & Guiqing Zhang, 2022. "Single machine lot scheduling with non-uniform lot capacities and processing times," Journal of Combinatorial Optimization, Springer, vol. 43(5), pages 1359-1367, July.
  • Handle: RePEc:spr:jcomop:v:43:y:2022:i:5:d:10.1007_s10878-020-00654-5
    DOI: 10.1007/s10878-020-00654-5
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10878-020-00654-5
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10878-020-00654-5?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Gregory Dobson & Uday S. Karmarkar & Jeffrey L. Rummel, 1989. "Batching to Minimize Flow Times on Parallel Heterogeneous Machines," Management Science, INFORMS, vol. 35(5), pages 607-613, May.
    2. Edward G. Coffman & Ardavan Nozari & Mihalis Yannakakis, 1989. "Optimal Scheduling of Products with Two Subassemblies on a Single Machine," Operations Research, INFORMS, vol. 37(3), pages 426-436, June.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mor, Baruch & Mosheiov, Gur, 2014. "Batch scheduling with a rate-modifying maintenance activity to minimize total flowtime," International Journal of Production Economics, Elsevier, vol. 153(C), pages 238-242.
    2. T.C.E. Cheng & B.M.T. Lin & A. Toker, 2000. "Makespan minimization in the two‐machine flowshop batch scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(2), pages 128-144, March.
    3. Ching, Chung Yaw & Liao, Ching-Jong & Wu, Chutao John, 1997. "Batching to minimize total production time for two part types," International Journal of Production Economics, Elsevier, vol. 48(1), pages 63-72, January.
    4. James D. Blocher & Dilip Chhajed, 1996. "The customer order lead‐time problem on parallel machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(5), pages 629-654, August.
    5. Gur Mosheiov & Daniel Oron, 2023. "A note on batch scheduling on a two-machine flowshop with machine-dependent processing times," 4OR, Springer, vol. 21(3), pages 457-469, September.
    6. Ji, Min & He, Yong & Cheng, T.C.E., 2007. "Batch delivery scheduling with batch delivery cost on a single machine," European Journal of Operational Research, Elsevier, vol. 176(2), pages 745-755, January.
    7. B. Lin & T. Cheng, 2005. "Two-Machine Flowshop Batching and Scheduling," Annals of Operations Research, Springer, vol. 133(1), pages 149-161, January.
    8. Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.
    9. Bolat, Ahmet, 1997. "Sequencing jobs for an automated manufacturing module with buffer," European Journal of Operational Research, Elsevier, vol. 96(3), pages 622-635, February.
    10. Gregory H. Graves & Chung‐Yee Lee, 1999. "Scheduling maintenance and semiresumable jobs on a single machine," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(7), pages 845-863, October.
    11. Potts, Chris N. & Kovalyov, Mikhail Y., 2000. "Scheduling with batching: A review," European Journal of Operational Research, Elsevier, vol. 120(2), pages 228-249, January.
    12. Reza Ahmadi & Uttarayan Bagchi & Thomas A. Roemer, 2005. "Coordinated scheduling of customer orders for quick response," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 493-512, September.
    13. Mosheiov, Gur & Oron, Daniel, 2008. "A single machine batch scheduling problem with bounded batch size," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1069-1079, June.
    14. Lambrecht, Marc R. & Vandaele, Nico J., 1996. "A general approximation for the single product lot sizing model with queueing delays," European Journal of Operational Research, Elsevier, vol. 95(1), pages 73-88, November.
    15. Chung-Lun Li & Chung-Yee Lee, 1997. "Scheduling with agreeable release times and due dates on a batch processing machine," European Journal of Operational Research, Elsevier, vol. 96(3), pages 564-569, February.
    16. Yoon, Sang Hum & Sung, Chang Sup, 2005. "Fixed pre-assembly scheduling on multiple fabrication machines," International Journal of Production Economics, Elsevier, vol. 96(1), pages 109-118, April.
    17. Fehmi Tanrisever & Erhan Kutanoglu, 2008. "Forming and scheduling jobs with capacitated containers in semiconductor manufacturing: Single machine problem," Annals of Operations Research, Springer, vol. 159(1), pages 5-24, March.
    18. Gur Mosheiov & Daniel Oron & Yaacov Ritov, 2004. "Flow‐shop batch scheduling with identical processing‐time jobs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(6), pages 783-799, September.
    19. Zhou, Feng & Blocher, James D. & Hu, Xinxin & Sebastian Heese, H., 2014. "Optimal single machine scheduling of products with components and changeover cost," European Journal of Operational Research, Elsevier, vol. 233(1), pages 75-83.
    20. Leung, Joseph Y.-T. & Lee, C.Y. & Ng, C.W. & Young, G.H., 2008. "Preemptive multiprocessor order scheduling to minimize total weighted flowtime," European Journal of Operational Research, Elsevier, vol. 190(1), pages 40-51, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:jcomop:v:43:y:2022:i:5:d:10.1007_s10878-020-00654-5. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.