The shunting scheduling of EMU first-level maintenance in a stub-end depot
Author
Abstract
Suggested Citation
DOI: 10.1007/s10696-022-09459-6
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Wenliang Zhou & Junli Tian & Jin Qin & Lianbo Deng & TangJian Wei, 2015. "Optimization of Multiperiod Mixed Train Schedule on High-Speed Railway," Discrete Dynamics in Nature and Society, Hindawi, vol. 2015, pages 1-14, April.
- Julia Lange & Frank Werner, 2018. "Approaches to modeling train scheduling problems as job-shop problems with blocking constraints," Journal of Scheduling, Springer, vol. 21(2), pages 191-207, April.
- Ziyan Feng & Chengxuan Cao & Yutong Liu & Yaling Zhou, 2018. "A Multiobjective Optimization for Train Routing at the High-Speed Railway Station Based on Tabu Search Algorithm," Mathematical Problems in Engineering, Hindawi, vol. 2018, pages 1-22, October.
- Wenjun Li & Lei Nie & Tianwei Zhang, 2018. "Electric multiple unit circulation plan optimization based on the branch-and-price algorithm under different maintenance management schemes," PLOS ONE, Public Library of Science, vol. 13(7), pages 1-23, July.
- Zikai Zhang & Qiuhua Tang, 2022. "Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics," Flexible Services and Manufacturing Journal, Springer, vol. 34(1), pages 156-203, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Meloni, Carlo & Pranzo, Marco & Samà , Marcella, 2022. "Evaluation of VaR and CVaR for the makespan in interval valued blocking job shops," International Journal of Production Economics, Elsevier, vol. 247(C).
- Wenjun Li & Peng Liu, 2022. "EMU Route Plan Optimization by Integrating Trains from Different Periods," Sustainability, MDPI, vol. 14(20), pages 1-14, October.
- Aliakbari, Mina & Geunes, Joseph & Ghahari, Amir & Prince, Mike, 2024. "Freight railcar-to-train assignment and departure scheduling in a railyard," European Journal of Operational Research, Elsevier, vol. 314(3), pages 950-962.
- Jayanth Krishna Mogali & Joris Kinable & Stephen F. Smith & Zachary B. Rubinstein, 2021. "Scheduling for multi-robot routing with blocking and enabling constraints," Journal of Scheduling, Springer, vol. 24(3), pages 291-318, June.
- Mina Aliakbari & Joseph Geunes, 2022. "Multiple Train Repositioning Operations in a Railyard Network," SN Operations Research Forum, Springer, vol. 3(4), pages 1-31, December.
- Lu Yang & Leishan Zhou & Hanxiao Zhou & Chang Han & Wenqiang Zhao, 2023. "A Lagrangian Method for Calculation of Passing Capacity on a Railway Hub Station," Mathematics, MDPI, vol. 11(6), pages 1-20, March.
- Mogali, Jayanth Krishna & Barbulescu, Laura & Smith, Stephen F., 2021. "Efficient primal heuristic updates for the blocking job shop problem," European Journal of Operational Research, Elsevier, vol. 295(1), pages 82-101.
- Weiya Chen & Weiting Yang & Guangdong Zhang, 2022. "Track Utilization Optimization Method for Arrival Yard of Marshalling Station Considering Arrival and Break-Up Coordination Operation," Mathematics, MDPI, vol. 10(18), pages 1-12, September.
- Evgeny Gafarov & Frank Werner, 2019. "Two-Machine Job-Shop Scheduling with Equal Processing Times on Each Machine," Mathematics, MDPI, vol. 7(3), pages 1-11, March.
- Roman Vavrek, 2021. "An Analysis of Usage of a Multi-Criteria Approach in an Athlete Evaluation: An Evidence of NHL Attackers," Mathematics, MDPI, vol. 9(12), pages 1-22, June.
More about this item
Keywords
Shunting scheduling; EMU first-level maintenance; Flexible maintenance routes; Stub-end depot; MILP; EPSO;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:flsman:v:35:y:2023:i:3:d:10.1007_s10696-022-09459-6. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.