IDEAS home Printed from https://ideas.repec.org/a/spr/eurjco/v6y2018i1d10.1007_s13675-017-0086-2.html
   My bibliography  Save this article

A local search algorithm: minimizing makespan of deteriorating jobs with relaxed agreeable weights

Author

Listed:
  • Anjulika Gupta

    (R.V. College of Engineering)

  • Prabha Sharma

    (The NorthCap University)

  • Hemant Salwan

    (The NorthCap University)

Abstract

In this paper, we consider the problem of minimizing makespan of n deteriorating jobs on a single machine. Rates of deterioration are job-dependent and constant with respect to the starting times. Jobs begin to deteriorate after a common critical date ‘d.’ The concept of relaxed agreeable weights is introduced. It is shown that the problem is NP-hard. The condition of relaxed agreeable weights and the structure of the problem are used to show that our local search algorithm, to obtain a locally optimal solution, will require polynomial effort in the number of jobs.

Suggested Citation

  • Anjulika Gupta & Prabha Sharma & Hemant Salwan, 2018. "A local search algorithm: minimizing makespan of deteriorating jobs with relaxed agreeable weights," EURO Journal on Computational Optimization, Springer;EURO - The Association of European Operational Research Societies, vol. 6(1), pages 29-54, March.
  • Handle: RePEc:spr:eurjco:v:6:y:2018:i:1:d:10.1007_s13675-017-0086-2
    DOI: 10.1007/s13675-017-0086-2
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s13675-017-0086-2
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s13675-017-0086-2?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Gupta, Sushil K & Kunnathur, Anand S & Dandapani, Krishnan, 1987. "Optimal repayment policies for multiple loans," Omega, Elsevier, vol. 15(4), pages 323-330.
    2. Kunnathur, Anand S. & Gupta, Sushil K., 1990. "Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem," European Journal of Operational Research, Elsevier, vol. 47(1), pages 56-64, July.
    3. Leung, Joseph Y.-T. & Ng, C.T. & Cheng, T.C. Edwin, 2008. "Minimizing sum of completion times for batch scheduling of jobs with deteriorating processing times," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1090-1099, June.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Stanisław Gawiejnowicz, 2020. "A review of four decades of time-dependent scheduling: main results, new topics, and open problems," Journal of Scheduling, Springer, vol. 23(1), pages 3-47, February.
    2. C-C He & C-C Wu & W-C Lee, 2009. "Branch-and-bound and weight-combination search algorithms for the total completion time problem with step-deteriorating jobs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(12), pages 1759-1766, December.
    3. Qian, Jianbo & Steiner, George, 2013. "Fast algorithms for scheduling with learning effects and time-dependent processing times on a single machine," European Journal of Operational Research, Elsevier, vol. 225(3), pages 547-551.
    4. C. Ng & Q. Ding & T. Cheng & S. Lam, 2012. "Preemptive repayment policy for multiple loans," Annals of Operations Research, Springer, vol. 192(1), pages 141-150, January.
    5. Cheng, T. C. E. & Ding, Q. & Lin, B. M. T., 2004. "A concise survey of scheduling with time-dependent processing times," European Journal of Operational Research, Elsevier, vol. 152(1), pages 1-13, January.
    6. Wieslaw Kubiak & Steef van de Velde, 1998. "Scheduling deteriorating jobs to minimize makespan," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(5), pages 511-523, August.
    7. A A K Jeng & B M T Lin, 2004. "Makespan minimization in single-machine scheduling with step-deterioration of processing times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(3), pages 247-256, March.
    8. Delorme, Maxence & Iori, Manuel & Mendes, Nilson F.M., 2021. "Solution methods for scheduling problems with sequence-dependent deterioration and maintenance events," European Journal of Operational Research, Elsevier, vol. 295(3), pages 823-837.
    9. W-H Kuo & D-L Yang, 2008. "A note on due-date assignment and single-machine scheduling with deteriorating jobs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(6), pages 857-859, June.
    10. Mostafa Khatami & Amir Salehipour, 2021. "Coupled task scheduling with time-dependent processing times," Journal of Scheduling, Springer, vol. 24(2), pages 223-236, April.
    11. Wu, Chin-Chia & Lee, Wen-Chiung, 2006. "Two-machine flowshop scheduling to minimize mean flow time under linear deterioration," International Journal of Production Economics, Elsevier, vol. 103(2), pages 572-584, October.
    12. Min Ji & Chou-Jung Hsu & Dar-Li Yang, 2013. "Single-machine scheduling with deteriorating jobs and aging effects under an optional maintenance activity consideration," Journal of Combinatorial Optimization, Springer, vol. 26(3), pages 437-447, October.
    13. Shakeri, Shakib & Logendran, Rasaratnam, 2007. "A mathematical programming-based scheduling framework for multitasking environments," European Journal of Operational Research, Elsevier, vol. 176(1), pages 193-209, January.
    14. Anna Arigliano & Gianpaolo Ghiani & Antonio Grieco & Emanuela Guerriero, 2017. "Single-machine time-dependent scheduling problems with fixed rate-modifying activities and resumable jobs," 4OR, Springer, vol. 15(2), pages 201-215, June.
    15. Faranak Emtehani & Nasim Nahavandi & Farimah Mokhatab Rafiei, 2021. "A joint inventory–finance model for coordinating a capital-constrained supply chain with financing limitations," Financial Innovation, Springer;Southwestern University of Finance and Economics, vol. 7(1), pages 1-39, December.
    16. Aarabi, Fatemeh & Batta, Rajan, 2020. "Scheduling spatially distributed jobs with degradation: Application to pothole repair," Socio-Economic Planning Sciences, Elsevier, vol. 72(C).
    17. Bachman, Aleksander & Janiak, Adam, 2000. "Minimizing maximum lateness under linear deterioration," European Journal of Operational Research, Elsevier, vol. 126(3), pages 557-566, November.
    18. Ji, Min & Cheng, T.C.E., 2010. "Batch scheduling of simple linear deteriorating jobs on a single machine to minimize makespan," European Journal of Operational Research, Elsevier, vol. 202(1), pages 90-98, April.
    19. Wang, Ji-Bo, 2007. "Single-machine scheduling problems with the effects of learning and deterioration," Omega, Elsevier, vol. 35(4), pages 397-402, August.
    20. Wen-Chiung Lee, 2004. "A Note on Deteriorating Jobs and Learning in Single-Machine Scheduling Problems," International Journal of Business and Economics, School of Management Development, Feng Chia University, Taichung, Taiwan, vol. 3(1), pages 83-89, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:eurjco:v:6:y:2018:i:1:d:10.1007_s13675-017-0086-2. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.