IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v87y1999i0p87-10110.1023-a1018913926245.html
   My bibliography  Save this article

Optimal pacing in an assembly-based multi-stage production system

Author

Listed:
  • J.J. Liu
  • H. Chen

Abstract

We examine periodic pacing in a multi‐stage non‐synchronous production system where production stages are distributed over various locations. The processing rates and inspection failure rates at each stage are random. The optimal policy for pacing (e.g., buffering) the flow of in‐process inventory between stages is pursued to minimize operational costs over a finite horizon. It is known that the optimal control is extremely complex in general. However, separability across the stages is shown under weighted penalties which results in a decentralized heuristic pacing. Numerical comparisons of heuristic and optimal solutions are reported. We obtained sufficient conditions under which the heuristic pacing is finite. As a result, an efficient algorithm is developed for the design of inter‐stage buffers. Copyright Kluwer Academic Publishers 1999

Suggested Citation

  • J.J. Liu & H. Chen, 1999. "Optimal pacing in an assembly-based multi-stage production system," Annals of Operations Research, Springer, vol. 87(0), pages 87-101, April.
  • Handle: RePEc:spr:annopr:v:87:y:1999:i:0:p:87-101:10.1023/a:1018913926245
    DOI: 10.1023/A:1018913926245
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1023/A:1018913926245
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1023/A:1018913926245?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Xu Guan & Guo Li & Zhe Yin, 2016. "The implication of time-based payment contract in the decentralized assembly system," Annals of Operations Research, Springer, vol. 240(2), pages 641-659, May.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:87:y:1999:i:0:p:87-101:10.1023/a:1018913926245. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.