IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v321y2023i1d10.1007_s10479-022-04893-z.html
   My bibliography  Save this article

Integrating SLP with simulation to design and evaluate facility layout for industrial head lettuce production

Author

Listed:
  • Guohua Gao

    (Beijing University of Technology)

  • Yongbing Feng

    (Beijing University of Technology)

  • Zihua Zhang

    (Beijing University of Technology)

  • Shuangyou Wang

    (Beijing University of Technology)

  • Zizhao Yang

    (Beijing University of Technology)

Abstract

Because of the global competition of greenhouses and the importance of the global food safety, designing higher yield and efficiency greenhouse systems becomes a hot spot problem. A greenhouse designed for industrial head lettuce production not only can increase yield by using A-Frame systems, but can also improve efficiency through an operation process of alleviating human labor by machines. However, the facility layout problem (FLP) of greenhouse with complex crop production system and multi machines was always ignored in the past decades. In order to maximize production capacity and efficiency, the FLP of greenhouse should be considered as an essential section at the conceptual design phase. To overcome these problems, a framework integrating systematic layout planning (SLP) and simulation is proposed to design and evaluate facility layout in greenhouses. When applying the framework to the facility layout for industrial head lettuce production, we can get the optimal layout plan which lead to a daily production of 7752 head lettuces within about 98 min in a greenhouse of 14,784 m2 and an efficiency improvement of 67.31% compared with another initial layout plan. These research results can help the designer find a more effective layout and the managers to support decisions before greenhouse construction.

Suggested Citation

  • Guohua Gao & Yongbing Feng & Zihua Zhang & Shuangyou Wang & Zizhao Yang, 2023. "Integrating SLP with simulation to design and evaluate facility layout for industrial head lettuce production," Annals of Operations Research, Springer, vol. 321(1), pages 209-240, February.
  • Handle: RePEc:spr:annopr:v:321:y:2023:i:1:d:10.1007_s10479-022-04893-z
    DOI: 10.1007/s10479-022-04893-z
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10479-022-04893-z
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10479-022-04893-z?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Eben-Chaime, Moshe & Bechar, Avital & Baron, Ana, 2011. "Economical evaluation of greenhouse layout design," International Journal of Production Economics, Elsevier, vol. 134(1), pages 246-254, November.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hu, Ming-Che & Chen, Yu-Hui & Huang, Li-Chun, 2014. "A sustainable vegetable supply chain using plant factories in Taiwanese markets: A Nash–Cournot model," International Journal of Production Economics, Elsevier, vol. 152(C), pages 49-56.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:321:y:2023:i:1:d:10.1007_s10479-022-04893-z. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.