Effects of different cut-to-length harvesting structures on the economic value of a wood procurement planning problem
Author
Abstract
Suggested Citation
DOI: 10.1007/s10479-013-1336-1
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Melo, M.T. & Nickel, S. & Saldanha-da-Gama, F., 2009. "Facility location and supply chain management - A review," European Journal of Operational Research, Elsevier, vol. 196(2), pages 401-412, July.
- Epstein, R. & Nieto, E. & Weintraub, A. & Chevalier, P. & Gabarro, J., 1999. "A system for the design of short term harvesting strategy," European Journal of Operational Research, Elsevier, vol. 119(2), pages 427-439, December.
- Carlsson, Dick & Ronnqvist, Mikael, 2005. "Supply chain management in forestry--case studies at Sodra Cell AB," European Journal of Operational Research, Elsevier, vol. 163(3), pages 589-616, June.
- Chauhan, Satyaveer S. & Frayret, Jean-Marc & LeBel, Luc, 2009. "Multi-commodity supply network planning in the forest supply chain," European Journal of Operational Research, Elsevier, vol. 196(2), pages 688-696, July.
- Martell, David L. & Gunn, Eldon A. & Weintraub, Andres, 1998. "Forest management challenges for operational researchers," European Journal of Operational Research, Elsevier, vol. 104(1), pages 1-17, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Adejuyigbe O. Fajemisin & Laura Climent & Steven D. Prestwich, 2021. "An analytics-based heuristic decomposition of a bilevel multiple-follower cutting stock problem," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(3), pages 665-692, September.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Satyaveer Chauhan & J.-M. Frayret & Luc LeBel, 2011. "Supply network planning in the forest supply chain with bucking decisions anticipation," Annals of Operations Research, Springer, vol. 190(1), pages 93-115, October.
- Li, Xiaopeng, 2013. "An integrated modeling framework for design of logistics networks with expedited shipment services," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 56(C), pages 46-63.
- Dems, A. & Rousseau, L.M. & Frayret, J.M., 2017. "Annual timber procurement planning with bucking decisions," European Journal of Operational Research, Elsevier, vol. 259(2), pages 713-720.
- Becker, Tristan & Lier, Stefan & Werners, Brigitte, 2019. "Value of modular production concepts in future chemical industry production networks," European Journal of Operational Research, Elsevier, vol. 276(3), pages 957-970.
- Venn, Tyron J. & Dorries, Jack W. & McGavin, Robert L., 2021. "A mathematical model to support investment in veneer and LVL manufacturing in subtropical eastern Australia," Forest Policy and Economics, Elsevier, vol. 128(C).
- Kai L. Ross & Sándor F. Tóth & Weikko S. Jaross, 2018. "Forest Harvest Scheduling with Endogenous Road Costs," Interfaces, INFORMS, vol. 48(3), pages 260-270, June.
- Bartosz Sawik, 2024. "Optimizing Last-Mile Delivery: A Multi-Criteria Approach with Automated Smart Lockers, Capillary Distribution and Crowdshipping," Logistics, MDPI, vol. 8(2), pages 1-29, May.
- Sauvey, Christophe & Melo, Teresa & Correia, Isabel, 2019. "Two-phase heuristics for a multi-period capacitated facility location problem with service-differentiated customers," Technical Reports on Logistics of the Saarland Business School 16, Saarland University of Applied Sciences (htw saar), Saarland Business School.
- M. Fattahi & M. Mahootchi & S. M. Moattar Husseini, 2016. "Integrated strategic and tactical supply chain planning with price-sensitive demands," Annals of Operations Research, Springer, vol. 242(2), pages 423-456, July.
- Hasani, Aliakbar & Khosrojerdi, Amirhossein, 2016. "Robust global supply chain network design under disruption and uncertainty considering resilience strategies: A parallel memetic algorithm for a real-life case study," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 87(C), pages 20-52.
- Sabet, Ehsan & Yazdani, Baback & Kian, Ramez & Galanakis, Kostas, 2020. "A strategic and global manufacturing capacity management optimisation model: A Scenario-based multi-stage stochastic programming approach," Omega, Elsevier, vol. 93(C).
- Mustapha Ouhimmou & Sophie D'Amours & Robert Beauregard & Daoud Ait-Kadi & Satyaveer Singh Chauhan, 2009. "Optimization Helps Shermag Gain Competitive Edge," Interfaces, INFORMS, vol. 39(4), pages 329-345, August.
- Jesus Gonzalez-Feliu, 2013. "Vehicle Routing in Multi-Echelon Distribution Systems with Cross-Docking: A Systematic Lexical-Metanarrative Analysis," Post-Print halshs-00834573, HAL.
- Majid Eskandarpour & Pierre Dejax & Olivier Péton, 2019. "Multi-Directional Local Search for Sustainable Supply Chain Network Design," Post-Print hal-02407741, HAL.
- Shabnam Rekabi & Ali Ghodratnama & Amir Azaron, 2022. "Designing pharmaceutical supply chain networks with perishable items considering congestion," Operational Research, Springer, vol. 22(4), pages 4159-4219, September.
- Junming Liu & Weiwei Chen & Jingyuan Yang & Hui Xiong & Can Chen, 2022. "Iterative Prediction-and-Optimization for E-Logistics Distribution Network Design," INFORMS Journal on Computing, INFORMS, vol. 34(2), pages 769-789, March.
- Zhalechian, M. & Tavakkoli-Moghaddam, R. & Zahiri, B. & Mohammadi, M., 2016. "Sustainable design of a closed-loop location-routing-inventory supply chain network under mixed uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 89(C), pages 182-214.
- Thomé, Antonio Márcio T. & Scavarda, Luiz Felipe & Pires, Sílvio R.I. & Ceryno, Paula & Klingebiel, Katja, 2014. "A multi-tier study on supply chain flexibility in the automotive industry," International Journal of Production Economics, Elsevier, vol. 158(C), pages 91-105.
- Olivares-Benitez, Elias & Ríos-Mercado, Roger Z. & González-Velarde, José Luis, 2013. "A metaheuristic algorithm to solve the selection of transportation channels in supply chain design," International Journal of Production Economics, Elsevier, vol. 145(1), pages 161-172.
- Alam, Md Bedarul & Shahi, Chander & Pulkki, Reino, 2014. "Economic impact of enhanced forest inventory information and merchandizing yards in the forest product industry supply chain," Socio-Economic Planning Sciences, Elsevier, vol. 48(3), pages 189-197.
More about this item
Keywords
Cut-to-length harvesting system; Forest bucking problem; Wood-procurement planning; Mixed integer programming;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:232:y:2015:i:1:p:65-86:10.1007/s10479-013-1336-1. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.