IDEAS home Printed from https://ideas.repec.org/a/rje/bellje/v10y1979iautumnp549-565.html
   My bibliography  Save this article

Plant Size, Plant Factor, and the Shape of the Average Cost Function in Electric Power Generation: A Nonhomogeneous Capital Approach

Author

Listed:
  • John F. Stewart

Abstract

This paper models an electricity producing firm's ex ante choice of technology for a generating plant in a way that recognizes that planned output is best described by a load increment composed of an instantaneous rate and a time duration and that the cost of capital equipment is dependent on the size and fuel efficiency of the plant. We estimate the cost of equipment function for a sample of plants and use the results to simulate the ex ante average cost surface over a grid of load increments. The major finding of the paper is that plant size has relatively little effect on the average cost, while the plant utilization factor is the major element leading to reductions in average cost as cumulative output expands.

Suggested Citation

  • John F. Stewart, 1979. "Plant Size, Plant Factor, and the Shape of the Average Cost Function in Electric Power Generation: A Nonhomogeneous Capital Approach," Bell Journal of Economics, The RAND Corporation, vol. 10(2), pages 549-565, Autumn.
  • Handle: RePEc:rje:bellje:v:10:y:1979:i:autumn:p:549-565
    as

    Download full text from publisher

    File URL: http://links.jstor.org/sici?sici=0361-915X%28197923%2910%3A2%3C549%3APSPFAT%3E2.0.CO%3B2-%23&origin=repec
    File Function: full text
    Download Restriction: Access to full text is restricted to JSTOR subscribers. See http://www.jstor.org for details.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zhang, Liang, 2012. "Electricity pricing in a partial reformed plan system: The case of China," Energy Policy, Elsevier, vol. 43(C), pages 214-225.
    2. Soderholm, Patrik, 2001. "Fossil fuel flexibility in west European power generation and the impact of system load factors," Energy Economics, Elsevier, vol. 23(1), pages 77-97, January.
    3. Patrik Söderholm, 1999. "The political economy of power generation in Zimbabwe since 1980," Natural Resources Forum, Blackwell Publishing, vol. 23(4), pages 335-346, November.
    4. Alice Shiu & Raymond Li & Chi-Keung Woo, 2016. "Economic Growth and Infrastructure Investments in Energy and Transportation: A Causality Interpretation of China’s Western Development Strategy," The Energy Journal, , vol. 37(1_suppl), pages 211-222, January.
    5. Cheng, Yuk-Shing & Li, Raymond & Woo, Chi-Keung, 2021. "Regional energy-growth nexus and energy conservation policy in China," Energy, Elsevier, vol. 217(C).
    6. Harald Tauchmann, 2004. "Firing the Furnace? – An Econometric Analysis of Utilities’ Fuel Choice," RWI Discussion Papers 0017, Rheinisch-Westfälisches Institut für Wirtschaftsforschung.
    7. David P. Baron & Raymond R. De Bondt, 1980. "Factor Price Changes," Discussion Papers 417, Northwestern University, Center for Mathematical Studies in Economics and Management Science.
    8. repec:zbw:rwidps:0017 is not listed on IDEAS
    9. Harald Tauchmann, 2005. "Co2 Abatement and Fuel Mix in German Electric Power Generation — Is the “Ecological Electricity Tax†Ecologically Effective?," Energy & Environment, , vol. 16(2), pages 255-271, March.
    10. Tauchmann, H., 2006. "Firing the furnace? An econometric analysis of utilities' fuel choice," Energy Policy, Elsevier, vol. 34(18), pages 3898-3909, December.
    11. Alice Shiu, Raymond Li, and Chi-Keung Woo, 2016. "Economic Growth and Infrastructure Investments in Energy and Transportation: A Causality Interpretation of Chinas Western Development Strategy," The Energy Journal, International Association for Energy Economics, vol. 0(China Spe).
    12. Jeff Bateson & Peter L. Swan, 1989. "Economies of Scale and Utilization: An Analysis of the Multi‐Plant Generation Costs of the Electricity Commission of New South Wales, 1970/71–1984/85," The Economic Record, The Economic Society of Australia, vol. 65(4), pages 329-344, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:rje:bellje:v:10:y:1979:i:autumn:p:549-565. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: the person in charge (email available below). General contact details of provider: https://www.rje.org .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.