A note: a due-window assignment problem on parallel identical machines

Author

Listed:
  • G Mosheiov

    (The Hebrew University)

  • A Sarig

    (The Hebrew University)

Abstract

We solve a due-window assignment problem on parallel identical machines. In addition to the standard objective of finding the optimal job schedule, in due-window assignment problems one has to assign a time interval during which goods are delivered to customers with no cost. Jobs scheduled prior to or after the due-window are penalized according to their earliness/tardiness value. We assume that jobs have identical processing times, but may have job-dependent earliness and tardiness costs (eg, due to possible different destinations). We show that the problem can be reduced to a non-standard asymmetric assignment problem, and introduce an efficient (O(n 4)) solution procedure.

Suggested Citation

  • G Mosheiov & A Sarig, 2011. "A note: a due-window assignment problem on parallel identical machines," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(1), pages 238-241, January.
  • Handle: RePEc:pal:jorsoc:v:62:y:2011:i:1:d:10.1057_jors.2009.179
    DOI: 10.1057/jors.2009.179
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/jors.2009.179
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/jors.2009.179?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Gur Mosheiov & Daniel Oron, 2004. "Due‐window assignment with unit processing‐time jobs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(7), pages 1005-1017, October.
    2. Gordon, Valery & Proth, Jean-Marie & Chu, Chengbin, 2002. "A survey of the state-of-the-art of common due date assignment and scheduling research," European Journal of Operational Research, Elsevier, vol. 139(1), pages 1-25, May.
    3. Nicholas G. Hall & Wieslaw Kubiak & Suresh P. Sethi, 1991. "Earliness–Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date," Operations Research, INFORMS, vol. 39(5), pages 847-856, October.
    4. Liman, Surya D. & Panwalkar, Shrikant S. & Thongmee, Sansern, 1996. "Determination of common due window location in a single machine scheduling problem," European Journal of Operational Research, Elsevier, vol. 93(1), pages 68-74, August.
    5. Mosheiov, Gur & Yovel, Uri, 2006. "Minimizing weighted earliness-tardiness and due-date cost with unit processing-time jobs," European Journal of Operational Research, Elsevier, vol. 172(2), pages 528-544, July.
    6. Nicholas G. Hall & Marc E. Posner, 1991. "Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date," Operations Research, INFORMS, vol. 39(5), pages 836-846, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Janiak, Adam & Janiak, Władysław A. & Krysiak, Tomasz & Kwiatkowski, Tomasz, 2015. "A survey on scheduling problems with due windows," European Journal of Operational Research, Elsevier, vol. 242(2), pages 347-357.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sang, Yao-Wen & Wang, Jun-Qiang & Sterna, Małgorzata & Błażewicz, Jacek, 2023. "Single machine scheduling with due date assignment to minimize the total weighted lead time penalty and late work," Omega, Elsevier, vol. 121(C).
    2. Biskup, Dirk & Feldmann, Martin, 2005. "On scheduling around large restrictive common due windows," European Journal of Operational Research, Elsevier, vol. 162(3), pages 740-761, May.
    3. Gerstl, Enrique & Mosheiov, Gur, 2013. "Due-window assignment with identical jobs on parallel uniform machines," European Journal of Operational Research, Elsevier, vol. 229(1), pages 41-47.
    4. Oğuzhan Ahmet Arik, 2023. "A heuristic for single machine common due date assignment problem with different earliness/tardiness weights," OPSEARCH, Springer;Operational Research Society of India, vol. 60(3), pages 1561-1574, September.
    5. Feng Li & Zhi-Long Chen & Zhi-Long Chen, 2017. "Integrated Production, Inventory and Delivery Problems: Complexity and Algorithms," INFORMS Journal on Computing, INFORMS, vol. 29(2), pages 232-250, May.
    6. Hino, Celso M. & Ronconi, Debora P. & Mendes, Andre B., 2005. "Minimizing earliness and tardiness penalties in a single-machine problem with a common due date," European Journal of Operational Research, Elsevier, vol. 160(1), pages 190-201, January.
    7. Lin, Shih-Wei & Chou, Shuo-Yan & Ying, Kuo-Ching, 2007. "A sequential exchange approach for minimizing earliness-tardiness penalties of single-machine scheduling with a common due date," European Journal of Operational Research, Elsevier, vol. 177(2), pages 1294-1301, March.
    8. Dvir Shabtay & George Steiner, 2008. "The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times," Annals of Operations Research, Springer, vol. 159(1), pages 25-40, March.
    9. Wang, Julong & Liu, Zhixue & Li, Feng, 2024. "Integrated production and transportation scheduling problem under nonlinear cost structures," European Journal of Operational Research, Elsevier, vol. 313(3), pages 883-904.
    10. Shabtay, Dvir & Mosheiov, Gur & Oron, Daniel, 2022. "Single machine scheduling with common assignable due date/due window to minimize total weighted early and late work," European Journal of Operational Research, Elsevier, vol. 303(1), pages 66-77.
    11. Baruch Mor & Gur Mosheiov, 2022. "Single machine scheduling to maximize the weighted number of on-time jobs with job-rejection," Operational Research, Springer, vol. 22(3), pages 2707-2719, July.
    12. Esteve, B. & Aubijoux, C. & Chartier, A. & T'kindt, V., 2006. "A recovering beam search algorithm for the single machine Just-in-Time scheduling problem," European Journal of Operational Research, Elsevier, vol. 172(3), pages 798-813, August.
    13. Gordon, Valery & Proth, Jean-Marie & Chu, Chengbin, 2002. "A survey of the state-of-the-art of common due date assignment and scheduling research," European Journal of Operational Research, Elsevier, vol. 139(1), pages 1-25, May.
    14. Koulamas, Christos & Kyparisis, George J., 2023. "A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems," European Journal of Operational Research, Elsevier, vol. 305(3), pages 999-1017.
    15. Hoogeveen, Han, 2005. "Multicriteria scheduling," European Journal of Operational Research, Elsevier, vol. 167(3), pages 592-623, December.
    16. Shabtay, Dvir, 2016. "Optimal restricted due date assignment in scheduling," European Journal of Operational Research, Elsevier, vol. 252(1), pages 79-89.
    17. Baker, Kenneth R., 2014. "Minimizing earliness and tardiness costs in stochastic scheduling," European Journal of Operational Research, Elsevier, vol. 236(2), pages 445-452.
    18. Shabtay, Dvir & Steiner, George & Zhang, Rui, 2016. "Optimal coordination of resource allocation, due date assignment and scheduling decisions," Omega, Elsevier, vol. 65(C), pages 41-54.
    19. X. Cai & F. S. Tu, 1996. "Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early‐tardy penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(8), pages 1127-1146, December.
    20. Li, Y. & Ip, W. H. & Wang, D. W., 1998. "Genetic algorithm approach to earliness and tardiness production scheduling and planning problem," International Journal of Production Economics, Elsevier, vol. 54(1), pages 65-76, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:62:y:2011:i:1:d:10.1057_jors.2009.179. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.