IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v58y2007i1d10.1057_palgrave.jors.2602099.html
   My bibliography  Save this article

A new algorithm for minimizing makespan, C max, in blocking flow-shop problem through slowing down the operations

Author

Listed:
  • I N Kamal Abadi

    (University of Kurdistan)

Abstract

In this paper, a new algorithm with complexity O(nm 2) is presented, which finds the optimal makespan, C max, for a blocking flow-shop problem by slowing down the operations of a no-wait flow-shop problem, F m ∣no-wait∣C max, for a given sequence where restriction on the slowing down is committed. However, the problem with performance measure makespan, C max, in a non-cyclic environment, is a special case of cyclic problem with cycle time, C t , as its performance measure. This new algorithm is much faster than the previously developed algorithms for cyclical scheduling problems.

Suggested Citation

  • I N Kamal Abadi, 2007. "A new algorithm for minimizing makespan, C max, in blocking flow-shop problem through slowing down the operations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(1), pages 134-140, January.
  • Handle: RePEc:pal:jorsoc:v:58:y:2007:i:1:d:10.1057_palgrave.jors.2602099
    DOI: 10.1057/palgrave.jors.2602099
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/palgrave.jors.2602099
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/palgrave.jors.2602099?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. S. Thomas McCormick & Michael L. Pinedo & Scott Shenker & Barry Wolf, 1989. "Sequencing in an Assembly Line with Blocking to Minimize Cycle Time," Operations Research, INFORMS, vol. 37(6), pages 925-935, December.
    2. Michel Gendreau & Alain Hertz & Gilbert Laporte, 1992. "New Insertion and Postoptimization Procedures for the Traveling Salesman Problem," Operations Research, INFORMS, vol. 40(6), pages 1086-1094, December.
    3. I.N. Kamal Abadi & Nicholas G. Hall & Chelliah Sriskandarajah, 2000. "Minimizing Cycle Time in a Blocking Flowshop," Operations Research, INFORMS, vol. 48(1), pages 177-180, February.
    4. Ravindra K. Ahuja & James B. Orlin & Giovanni M. Sechi & Paola Zuddas, 1999. "Algorithms for the Simple Equal Flow Problem," Management Science, INFORMS, vol. 45(10), pages 1440-1455, October.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bagchi, Tapan P. & Gupta, Jatinder N.D. & Sriskandarajah, Chelliah, 2006. "A review of TSP based approaches for flowshop scheduling," European Journal of Operational Research, Elsevier, vol. 169(3), pages 816-854, March.
    2. Caraffa, Vince & Ianes, Stefano & P. Bagchi, Tapan & Sriskandarajah, Chelliah, 2001. "Minimizing makespan in a blocking flowshop using genetic algorithms," International Journal of Production Economics, Elsevier, vol. 70(2), pages 101-115, March.
    3. Ronconi, Débora P. & Henriques, Luís R.S., 2009. "Some heuristic algorithms for total tardiness minimization in a flowshop with blocking," Omega, Elsevier, vol. 37(2), pages 272-281, April.
    4. Lin, Shih-Wei & Ying, Kuo-Ching, 2013. "Minimizing makespan in a blocking flowshop using a revised artificial immune system algorithm," Omega, Elsevier, vol. 41(2), pages 383-389.
    5. I.N. Kamal Abadi & Nicholas G. Hall & Chelliah Sriskandarajah, 2000. "Minimizing Cycle Time in a Blocking Flowshop," Operations Research, INFORMS, vol. 48(1), pages 177-180, February.
    6. Zhichao Feng & Milind Dawande & Ganesh Janakiraman, 2021. "On the Capacity of a Process with Batch Processing and Setup Times," Production and Operations Management, Production and Operations Management Society, vol. 30(11), pages 4273-4287, November.
    7. Grabowski, Jøzef & Pempera, Jaroslaw, 2007. "The permutation flow shop problem with blocking. A tabu search approach," Omega, Elsevier, vol. 35(3), pages 302-311, June.
    8. Pan, Quan-Ke & Wang, Ling, 2012. "Effective heuristics for the blocking flowshop scheduling problem with makespan minimization," Omega, Elsevier, vol. 40(2), pages 218-229, April.
    9. Liu, Shi Qiang & Kozan, Erhan, 2009. "Scheduling a flow shop with combined buffer conditions," International Journal of Production Economics, Elsevier, vol. 117(2), pages 371-380, February.
    10. Carlier, Jacques & Haouari, Mohamed & Kharbeche, Mohamed & Moukrim, Aziz, 2010. "An optimization-based heuristic for the robotic cell problem," European Journal of Operational Research, Elsevier, vol. 202(3), pages 636-645, May.
    11. Milind Dawande & Zhichao Feng & Ganesh Janakiraman, 2021. "On the Structure of Bottlenecks in Processes," Management Science, INFORMS, vol. 67(6), pages 3853-3870, June.
    12. Débora Ronconi, 2005. "A Branch-and-Bound Algorithm to Minimize the Makespan in a Flowshop with Blocking," Annals of Operations Research, Springer, vol. 138(1), pages 53-65, September.
    13. Smith, Kate & Palaniswami, M. & Krishnamoorthy, M., 1996. "Traditional heuristic versus Hopfield neural network approaches to a car sequencing problem," European Journal of Operational Research, Elsevier, vol. 93(2), pages 300-316, September.
    14. Gendreau, Michel & Laporte, Gilbert & Semet, Frederic, 1998. "A tabu search heuristic for the undirected selective travelling salesman problem," European Journal of Operational Research, Elsevier, vol. 106(2-3), pages 539-545, April.
    15. Pempera, Jaroslaw & Smutnicki, Czeslaw, 2018. "Open shop cyclic scheduling," European Journal of Operational Research, Elsevier, vol. 269(2), pages 773-781.
    16. Baals, Julian & Emde, Simon & Turkensteen, Marcel, 2023. "Minimizing earliness-tardiness costs in supplier networks—A just-in-time truck routing problem," European Journal of Operational Research, Elsevier, vol. 306(2), pages 707-741.
    17. Giovanni Sechi & Paola Zuddas, 2008. "Multiperiod Hypergraph Models for Water Systems Optimization," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 22(3), pages 307-320, March.
    18. Ahmadi, Reza H. & Mamer, John W., 1999. "Routing heuristics for automated pick and place machines," European Journal of Operational Research, Elsevier, vol. 117(3), pages 533-552, September.
    19. Jia Shu & Mabel C. Chou & Qizhang Liu & Chung-Piaw Teo & I-Lin Wang, 2013. "Models for Effective Deployment and Redistribution of Bicycles Within Public Bicycle-Sharing Systems," Operations Research, INFORMS, vol. 61(6), pages 1346-1359, December.
    20. Yossiri Adulyasak & Jean-François Cordeau & Raf Jans, 2014. "Optimization-Based Adaptive Large Neighborhood Search for the Production Routing Problem," Transportation Science, INFORMS, vol. 48(1), pages 20-45, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:58:y:2007:i:1:d:10.1057_palgrave.jors.2602099. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.