IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v53y2002i9d10.1057_palgrave.jors.2601403.html
   My bibliography  Save this article

No-wait flowshops with bicriteria of makespan and total completion time

Author

Listed:
  • A Allahverdi

    (Kuwait University)

  • T Aldowaisan

    (Kuwait University)

Abstract

We consider the m-machine no-wait flowshop scheduling problem with the objective of minimizing a weighted sum of makespan and total completion time. For the two-machine problem, we develop a dominance relation and embed it within a proposed branch-and-bound algorithm. For the m-machine problem, we propose a heuristic. Computational experiments show that the proposed heuristic outperforms the best existing multi-criteria heuristics and the best single criterion heuristics for makespan and total completion time. The efficiency of the dominance relation and branch-and-bound algorithm is also investigated and shown to be effective.

Suggested Citation

  • A Allahverdi & T Aldowaisan, 2002. "No-wait flowshops with bicriteria of makespan and total completion time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 53(9), pages 1004-1015, September.
  • Handle: RePEc:pal:jorsoc:v:53:y:2002:i:9:d:10.1057_palgrave.jors.2601403
    DOI: 10.1057/palgrave.jors.2601403
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/palgrave.jors.2601403
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/palgrave.jors.2601403?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Abdennour Azerine & Mourad Boudhar & Djamal Rebaine, 2022. "A two-machine no-wait flow shop problem with two competing agents," Journal of Combinatorial Optimization, Springer, vol. 43(1), pages 168-199, January.
    2. Allahverdi, Ali, 2016. "A survey of scheduling problems with no-wait in process," European Journal of Operational Research, Elsevier, vol. 255(3), pages 665-686.
    3. Qi-Xia Yang & Long-Cheng Liu & Min Huang & Tian-Run Wang, 2024. "Algorithms for a two-machine no-wait flow shop scheduling problem with two competing agents," Journal of Combinatorial Optimization, Springer, vol. 48(1), pages 1-17, August.
    4. Allahverdi, Ali & Aydilek, Harun & Aydilek, Asiye, 2018. "No-wait flowshop scheduling problem with two criteria; total tardiness and makespan," European Journal of Operational Research, Elsevier, vol. 269(2), pages 590-601.
    5. Allahverdi, Ali & Aydilek, Harun, 2014. "Total completion time with makespan constraint in no-wait flowshops with setup times," European Journal of Operational Research, Elsevier, vol. 238(3), pages 724-734.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:53:y:2002:i:9:d:10.1057_palgrave.jors.2601403. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.