The Normal Distribution Formalization for Investment Economic Project Evaluation Using the Monte Carlo Method
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Dangl, Thomas, 1999. "Investment and capacity choice under uncertain demand," European Journal of Operational Research, Elsevier, vol. 117(3), pages 415-428, September.
- Avinash K. Dixit & Robert S. Pindyck, 1994. "Investment under Uncertainty," Economics Books, Princeton University Press, edition 1, number 5474.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Balter, Anne G. & Huisman, Kuno J.M. & Kort, Peter M., 2022. "Effects of creative destruction on the size and timing of an investment," International Journal of Production Economics, Elsevier, vol. 252(C).
- Alain Bensoussan & Benoit Chevalier-Roignant & Alejandro Rivera, 2022. "A model for wind farm management with option interactions," Post-Print hal-04325553, HAL.
- Qin, Ruwen & Nembhard, David A., 2012. "Demand modeling of stochastic product diffusion over the life cycle," International Journal of Production Economics, Elsevier, vol. 137(2), pages 201-210.
- Kort, Peter M. & Murto, Pauli & Pawlina, Grzegorz, 2010. "Uncertainty and stepwise investment," European Journal of Operational Research, Elsevier, vol. 202(1), pages 196-203, April.
- d'Halluin, Y. & Forsyth, P.A. & Vetzal, K.R., 2007. "Wireless network capacity management: A real options approach," European Journal of Operational Research, Elsevier, vol. 176(1), pages 584-609, January.
- Xingang Wen & Peter M. Kort & Dolf Talman, 2017.
"Volume flexibility and capacity investment: a real options approach,"
Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(12), pages 1633-1646, December.
- Wen, X. & Kort, P.M. & Talman, A.J.J., 2015. "Volume Flexibility and Capacity Investment : A Real Options Approach," Discussion Paper 2015-022, Tilburg University, Center for Economic Research.
- Wen, X. & Kort, P.M. & Talman, A.J.J., 2015. "Volume Flexibility and Capacity Investment : A Real Options Approach," Other publications TiSEM 1264ebd1-5c19-496f-a11c-6, Tilburg University, School of Economics and Management.
- Bøckman, Thor & Fleten, Stein-Erik & Juliussen, Erik & Langhammer, Håvard J. & Revdal, Ingemar, 2008.
"Investment timing and optimal capacity choice for small hydropower projects,"
European Journal of Operational Research, Elsevier, vol. 190(1), pages 255-267, October.
- Bøckman, Thor & Fleten, Stein-Erik & Juliussen, Erik & Langhammer, Håvard & Revdal, Ingemar, 2006. "Investment timing and optimal capacity choice for small hydropower projects," MPRA Paper 2693, University Library of Munich, Germany, revised 31 Dec 2006.
- Di Corato, Luca & Moretto, Michele & Vergalli, Sergio, 2014.
"Long-run investment under uncertain demand,"
Economic Modelling, Elsevier, vol. 41(C), pages 80-89.
- Luca Di Corato & Michele Moretto & Sergio Vergalli, 2013. "Long-run Investment under Uncertain Demand," Working Papers 2013.65, Fondazione Eni Enrico Mattei.
- Di Corato, Luca & Moretto, Michele & Vergalli, Sergio, 2013. "Long-run Investment under Uncertain Demand," Economy and Society 156574, Fondazione Eni Enrico Mattei (FEEM).
- Ketelaars, Martijn & Kort, Peter M., 2022.
"Investments in R&D and Production Capacity with Uncertain Breakthrough Time : Private versus Social Incentives,"
Discussion Paper
2022-010, Tilburg University, Center for Economic Research.
- Ketelaars, Martijn & Kort, Peter M., 2022. "Investments in R&D and Production Capacity with Uncertain Breakthrough Time : Private versus Social Incentives," Other publications TiSEM 345b87e4-1ed5-413f-9423-2, Tilburg University, School of Economics and Management.
- Michail Chronopoulos & Verena Hagspiel & Stein-Erik Fleten, 2017.
"Stepwise investment and capacity sizing under uncertainty,"
OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(2), pages 447-472, March.
- Chronopoulos, Michail & Hagspiel, Verena & Fleten, Stein–Erik, 2015. "Stepwise Investment and Capacity Sizing under Uncertainty," Discussion Papers 2015/10, Norwegian School of Economics, Department of Business and Management Science.
- Huberts, Nick F.D. & Rossi Silveira, Rafael, 2023. "How economic depreciation shapes the relationship of uncertainty with investments’ size & timing," International Journal of Production Economics, Elsevier, vol. 260(C).
- Michail Chronopoulos, Verena Hagspiel, and Stein-Erik Fleten, 2016.
"Stepwise Green Investment under Policy Uncertainty,"
The Energy Journal, International Association for Energy Economics, vol. 0(Number 4).
- Michail Chronopoulos & Verena Hagspiel & Stein-Erik Fleten, 2016. "Stepwise Green Investment under Policy Uncertainty," The Energy Journal, , vol. 37(4), pages 87-108, October.
- Bigerna, Simona & Hagspiel, Verena & Kort, Peter M. & Wen, Xingang, 2023.
"How damaging are environmental policy targets in terms of welfare?,"
European Journal of Operational Research, Elsevier, vol. 311(1), pages 354-372.
- Bigerna, Simona & Hagspiel, Verena & Kort, Peter M. & Wen, Xingang, 2023. "How damaging are environmental policy targets in terms of welfare?," Other publications TiSEM 6e8478eb-6632-4a1e-9dc7-f, Tilburg University, School of Economics and Management.
- Spiros H. Martzoukos & Nayia Pospori & Lenos Trigeorgis, 2024. "Corporate investment decisions with switch flexibility, constraints, and path-dependency," Review of Quantitative Finance and Accounting, Springer, vol. 62(3), pages 1223-1250, April.
- Charalambides, Marios & Koussis, Nicos, 2018. "A stochastic model with interacting managerial operating options and debt rescheduling," European Journal of Operational Research, Elsevier, vol. 267(1), pages 236-249.
- Castellini, Marta & Menoncin, Francesco & Moretto, Michele & Vergalli, Sergio, 2021.
"Photovoltaic Smart Grids in the prosumers investment decisions: a real option model,"
Journal of Economic Dynamics and Control, Elsevier, vol. 126(C).
- Marta Castellini & Francesco Menoncin & Michele Moretto & Sergio Vergalli, 2019. "Photovoltaic Smart Grids in the Prosumers Investment Decisions: a Real Option Model," Working Papers 2019.28, Fondazione Eni Enrico Mattei.
- Castellini, Marta & Menoncin, Francesco & Moretto, Michele & Vergalli, Sergio, 2020. "Photovoltaic Smart Grids in the Prosumers Investment Decisions: a Real Option Model," ES: Economics for Sustainability 301034, Fondazione Eni Enrico Mattei (FEEM) > ES: Economics for Sustainability.
- Della Seta, Marco & Gryglewicz, Sebastian & Kort, Peter M., 2012. "Optimal investment in learning-curve technologies," Journal of Economic Dynamics and Control, Elsevier, vol. 36(10), pages 1462-1476.
- Jouvet, Pierre-André & Le Cadre, Elodie & Orset, Caroline, 2012.
"Irreversible investment, uncertainty, and ambiguity: The case of bioenergy sector,"
Energy Economics, Elsevier, vol. 34(1), pages 45-53.
- Pierre-André Jouvet & Elodie Le Cadre & Caroline Orset, 2011. "Irreversible investment, uncertainty, and ambiguity: the case of bioenergy sector," Working Papers 1104, Chaire Economie du climat.
- Pierre-André Jouvet & Elodie Lecadre & Caroline Orset, 2011. "Irreversible investment, uncertainty, and ambiguity: the case of bioenergy sector," Working Papers 2011/01, INRA, Economie Publique.
- Pierre-André Jouvet & Elodie Le Cadre & Caroline Orset Orset, 2012. "Irreversible investment, uncertainty, and ambiguity: The case of bioenergy sector," Post-Print hal-01500840, HAL.
- Sarkar, Sudipto, 2021. "The uncertainty-investment relationship with endogenous capacity," Omega, Elsevier, vol. 98(C).
- Sarkar, Sudipto, 2018. "Optimal DOL (degree of operating leverage) with investment and production flexibility," International Journal of Production Economics, Elsevier, vol. 202(C), pages 172-181.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:mje:mjejnl:v:15:y:2019:i:4:161-171. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Nikola Draskovic Jelcic (email available below). General contact details of provider: http://www.mnje.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.