Author
Listed:
- Nils Boysen
(Lehrstuhl für Operations Management, Friedrich-Schiller-Universität Jena, 07743 Jena, Germany)
- Dirk Briskorn
(Lehrstuhl für BWL, Insbesondere Produktion und Logistik, Bergische Universität Wuppertal, 42119 Wuppertal, Germany)
- Johannes Rupp
(Lehrstuhl für Operations Management, Friedrich-Schiller-Universität Jena, 07743 Jena, Germany)
- Stefan Schwerdfeger
(Lehrstuhl für Operations Management, Friedrich-Schiller-Universität Jena, 07743 Jena, Germany)
Abstract
Underground passageways for the transport of goods and people have fascinated mankind throughout the centuries. Recent initiatives in different parts of the world aim at rekindling the freight tunnel concept for urban logistics. According to this concept, freight is lifted into a tunnel, moved via electrically powered vehicles, rail cars, or maglev shuttles toward inner-city microhubs, and finally delivered with environmentally friendly vehicles to urban recipients. The main justification for this concept to outweigh the huge tunnel boring cost is a substantial reduction of road-based urban freight traffic. To warn about unfulfilled expectations, however, we show that the combination of time-critical goods, small inner-city hubs with restricted storage capacity, and the wrong booking procedure can hinder a loading of tunnel vehicles to capacity. To do so, we consider a polynomially solvable scheduling problem where due date-restricted shipments are to be assigned to tunnel vehicles and delivered to a given set of microhubs with limited storage capacity. Scarce hub capacities, tight due dates, and the wrong booking policy may not only lead to unused tunnel capacity but also to shipments that cannot be feasibly transported through the tunnel. If they are handed over to trucks as a fallback option, we show that a Braess-like paradox can occur: The time-critical, small-lot transports of the leftover shipments can produce even more surface traffic than trucking all shipments right from the start without the tunnel.
Suggested Citation
Nils Boysen & Dirk Briskorn & Johannes Rupp & Stefan Schwerdfeger, 2024.
"Jam in the Tunnel: On Urban Freight Tunnels, Their Operational Scheduling, and Unused Transport Capacity,"
Service Science, INFORMS, vol. 16(3), pages 184-201, September.
Handle:
RePEc:inm:orserv:v:16:y:2024:i:3:p:184-201
DOI: 10.1287/serv.2023.0005
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:orserv:v:16:y:2024:i:3:p:184-201. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.