Optimal Policies for Multi-Echelon Inventory Problems with Batch Ordering
Author
Abstract
Suggested Citation
DOI: 10.1287/opre.48.3.376.12427
Download full text from publisher
References listed on IDEAS
- Charles P. Schmidt & Steven Nahmias, 1985. "Optimal Policy for a Two-Stage Assembly System under Random Demand," Operations Research, INFORMS, vol. 33(5), pages 1130-1145, October.
- Andrew J. Clark & Herbert Scarf, 2004.
"Optimal Policies for a Multi-Echelon Inventory Problem,"
Management Science, INFORMS, vol. 50(12_supple), pages 1782-1790, December.
- Andrew J. Clark & Herbert Scarf, 1960. "Optimal Policies for a Multi-Echelon Inventory Problem," Management Science, INFORMS, vol. 6(4), pages 475-490, July.
- Fangruo Chen & Yu-Sheng Zheng, 1994. "Lower Bounds for Multi-Echelon Stochastic Inventory Systems," Management Science, INFORMS, vol. 40(11), pages 1426-1443, November.
- Sven Axsäter & Kaj Rosling, 1993. "Notes: Installation vs. Echelon Stock Policies for Multilevel Inventory Control," Management Science, INFORMS, vol. 39(10), pages 1274-1280, October.
- Arthur F. Veinott, 1965. "The Optimal Inventory Policy for Batch Ordering," Operations Research, INFORMS, vol. 13(3), pages 424-432, June.
- Chen, Fangruo & Zheng, Yu-Sheng, 1993. "Inventory models with general backorder costs," European Journal of Operational Research, Elsevier, vol. 65(2), pages 175-186, March.
- Fangruo Chen & Yu-Sheng Zheng, 1998. "Near-Optimal Echelon-Stock (R, nQ) Policies in Multistage Serial Systems," Operations Research, INFORMS, vol. 46(4), pages 592-602, August.
- G. Hadley & T. M. Whitin, 1961. "A Family of Inventory Models," Management Science, INFORMS, vol. 7(4), pages 351-371, July.
- Fangruo Chen & Yu-Sheng Zheng, 1994. "Evaluating Echelon Stock (R, nQ) Policies in Serial Production/Inventory Systems with Stochastic Demand," Management Science, INFORMS, vol. 40(10), pages 1262-1275, October.
- Awi Federgruen & Paul Zipkin, 1984. "Computational Issues in an Infinite-Horizon, Multiechelon Inventory Model," Operations Research, INFORMS, vol. 32(4), pages 818-836, August.
- Fangruo Chen & Yu-Sheng Zheng, 1997. "One-Warehouse Multiretailer Systems with Centralized Stock Information," Operations Research, INFORMS, vol. 45(2), pages 275-287, April.
- Marc A. De Bodt & Stephen C. Graves, 1985. "Continuous-Review Policies for a Multi-Echelon Inventory Problem with Stochastic Demand," Management Science, INFORMS, vol. 31(10), pages 1286-1299, October.
- Kaj Rosling, 1989. "Optimal Inventory Policies for Assembly Systems Under Random Demands," Operations Research, INFORMS, vol. 37(4), pages 565-579, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
- Xiuli Chao & Sean X. Zhou, 2009. "Optimal Policy for a Multiechelon Inventory System with Batch Ordering and Fixed Replenishment Intervals," Operations Research, INFORMS, vol. 57(2), pages 377-390, April.
- Kevin H. Shang & Jing-Sheng Song, 2007. "Serial Supply Chains with Economies of Scale: Bounds and Approximations," Operations Research, INFORMS, vol. 55(5), pages 843-853, October.
- Li, Xiuhui & Wang, Qinan, 2007. "Coordination mechanisms of supply chain systems," European Journal of Operational Research, Elsevier, vol. 179(1), pages 1-16, May.
- Lingxiu Dong & Hau L. Lee, 2003. "Optimal Policies and Approximations for a Serial Multiechelon Inventory System with Time-Correlated Demand," Operations Research, INFORMS, vol. 51(6), pages 969-980, December.
- Fangruo Chen, 1998. "Echelon Reorder Points, Installation Reorder Points, and the Value of Centralized Demand Information," Management Science, INFORMS, vol. 44(12-Part-2), pages 221-234, December.
- van Houtum, G. J. & Inderfurth, K. & Zijm, W. H. M., 1996. "Materials coordination in stochastic multi-echelon systems," European Journal of Operational Research, Elsevier, vol. 95(1), pages 1-23, November.
- Gregory A. DeCroix, 2006. "Optimal Policy for a Multiechelon Inventory System with Remanufacturing," Operations Research, INFORMS, vol. 54(3), pages 532-543, June.
- Gregory A. DeCroix & Paul H. Zipkin, 2005. "Inventory Management for an Assembly System with Product or Component Returns," Management Science, INFORMS, vol. 51(8), pages 1250-1265, August.
- Rodney P. Parker & Roman Kapuscinski, 2004. "Optimal Policies for a Capacitated Two-Echelon Inventory System," Operations Research, INFORMS, vol. 52(5), pages 739-755, October.
- Fernando Bernstein & Gregory A. DeCroix, 2006. "Inventory Policies in a Decentralized Assembly System," Operations Research, INFORMS, vol. 54(2), pages 324-336, April.
- Ming Hu & Yi Yang, 2014. "Modified Echelon ( r, Q ) Policies with Guaranteed Performance Bounds for Stochastic Serial Inventory Systems," Operations Research, INFORMS, vol. 62(4), pages 812-828, August.
- Alexandar Angelus & Özalp Özer, 2016. "Knowledge You Can Act on: Optimal Policies for Assembly Systems with Expediting and Advance Demand Information," Operations Research, INFORMS, vol. 64(6), pages 1338-1371, December.
- Fangruo Chen & Jing-Sheng Song, 2001. "Optimal Policies for Multiechelon Inventory Problems with Markov-Modulated Demand," Operations Research, INFORMS, vol. 49(2), pages 226-234, April.
- Kevin H. Shang & Jing-Sheng Song & Paul H. Zipkin, 2009. "Coordination Mechanisms in Decentralized Serial Inventory Systems with Batch Ordering," Management Science, INFORMS, vol. 55(4), pages 685-695, April.
- Gregory A. DeCroix, 2013. "Inventory Management for an Assembly System Subject to Supply Disruptions," Management Science, INFORMS, vol. 59(9), pages 2079-2092, September.
- Toktas-Palut, Peral & Ülengin, Füsun, 2011. "Coordination in a two-stage capacitated supply chain with multiple suppliers," European Journal of Operational Research, Elsevier, vol. 212(1), pages 43-53, July.
- Diks, E. B. & de Kok, A. G. & Lagodimos, A. G., 1996. "Multi-echelon systems: A service measure perspective," European Journal of Operational Research, Elsevier, vol. 95(2), pages 241-263, December.
- Holly Lutze & Özalp Özer, 2008. "Promised Lead-Time Contracts Under Asymmetric Information," Operations Research, INFORMS, vol. 56(4), pages 898-915, August.
- Kevin H. Shang & Jing-Sheng Song, 2003. "Newsvendor Bounds and Heuristic for Optimal Policies in Serial Supply Chains," Management Science, INFORMS, vol. 49(5), pages 618-638, May.
More about this item
Keywords
Inventory/production: multi-stage/item; stochastic; fixed lot-sizes; optimal policies; Manufacturing: assembly systems;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:48:y:2000:i:3:p:376-389. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.