Workforce Planning in Mixed Model Assembly Systems
Author
Abstract
Suggested Citation
DOI: 10.1287/opre.45.4.553
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Heike, G. & Ramulu, M. & Sorenson, E. & Shanahan, P. & Moinzadeh, K., 2001. "Mixed model assembly alternatives for low-volume manufacturing: The case of the aerospace industry," International Journal of Production Economics, Elsevier, vol. 72(2), pages 103-120, July.
- Hashemi-Petroodi, S. Ehsan & Thevenin, Simon & Kovalev, Sergey & Dolgui, Alexandre, 2022. "Model-dependent task assignment in multi-manned mixed-model assembly lines with walking workers," Omega, Elsevier, vol. 113(C).
- Sayin, Serpil & Karabati, Selcuk, 2007. "Assigning cross-trained workers to departments: A two-stage optimization model to maximize utility and skill improvement," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1643-1658, February.
- Delorme, Xavier & Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y., 2019. "Minimizing the number of workers in a paced mixed-model assembly line," European Journal of Operational Research, Elsevier, vol. 272(1), pages 188-194.
- Jérémie Gallien & Serguei Netessine & Maher Lahmar & Hakan Ergan & Sergei V. Savin & Michael J. Fry, 2001. "The MSOM Society Student Paper Competition: Extended Abstracts of 2000 Winners," Manufacturing & Service Operations Management, INFORMS, vol. 3(1), pages 1-1.
- Xiaobo Zhao & Jianyong Liu & Katsuhisa Ohno & Shigenori Kotani, 2007. "Modeling and analysis of a mixed‐model assembly line with stochastic operation times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(6), pages 681-691, September.
- Eylem Tekin & Wallace J. Hopp & Mark P. Van Oyen, 2002. "Benefits of Skill Chaining in Production Lines with Cross-Trained Workers: An Extended Abstract," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 17-20.
- George L. Vairaktarakis & Chung‐Yee Lee, 2004. "Analysis of algorithms for two‐stage flowshops with multi‐processor task flexibility," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(1), pages 44-59, February.
- Jesús F. Lampón & Pablo Cabanelas & Javier González Benito, 2015. "The impact of implementation of a modular platform strategy in automobile manufacturing networks," Working Papers. Collection B: Regional and sectoral economics 1502, Universidade de Vigo, GEN - Governance and Economics research Network.
- A Lim & Z Xu, 2009. "Searching optimal resequencing and feature assignment on an automated assembly line," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(3), pages 361-371, March.
- George Vairaktarakis & Joseph G. Szmerekovsky & Jiayan Xu, 2016. "Level workforce planning for multistage transfer lines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(7), pages 577-590, October.
- Wallace J. Hopp & Eylem Tekin & Mark P. Van Oyen, 2004. "Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers," Management Science, INFORMS, vol. 50(1), pages 83-98, January.
- Xiaobo Zhao & Katsuhisa Ohno & Hon‐Shiang Lau, 2004. "A balancing problem for mixed model assembly lines with a paced moving conveyor," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(3), pages 446-464, April.
- Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y. & Malyutin, Sergey & Soukhal, Ameur, 2018. "Optimal workforce assignment to operations of a paced assembly line," European Journal of Operational Research, Elsevier, vol. 264(1), pages 200-211.
- Zhilan Lou & Wanchen Jie & Shuzhu Zhang, 2020. "Multi-Objective Optimization for Order Assignment in Food Delivery Industry with Human Factor Considerations," Sustainability, MDPI, vol. 12(19), pages 1-17, September.
- Vairaktarakis, George L. & Cai, Xiaoqiang & Lee, Chung-Yee, 2002. "Workforce planning in synchronous production systems," European Journal of Operational Research, Elsevier, vol. 136(3), pages 551-572, February.
More about this item
Keywords
production/scheduling; approximations/heuristic; sequencing/deterministic applications;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:45:y:1997:i:4:p:553-567. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.