The One-Machine Problem with Delayed Precedence Constraints and its Use in Job Shop Scheduling
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.41.1.94
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Egon Balas & Giuseppe Lancia & Paolo Serafini & Alkiviadis Vazacopoulos, 1998. "Job Shop Scheduling With Deadlines," Journal of Combinatorial Optimization, Springer, vol. 1(4), pages 329-353, December.
- Da Col, Giacomo & Teppan, Erich C., 2022. "Industrial-size job shop scheduling with constraint programming," Operations Research Perspectives, Elsevier, vol. 9(C).
- Mukherjee, Saral & Chatterjee, A.K., 2006. "Applying machine based decomposition in 2-machine flow shops," European Journal of Operational Research, Elsevier, vol. 169(3), pages 723-741, March.
- Zoghby, Jeriad & Wesley Barnes, J. & Hasenbein, John J., 2005. "Modeling the reentrant job shop scheduling problem with setups for metaheuristic searches," European Journal of Operational Research, Elsevier, vol. 167(2), pages 336-348, December.
- Michael Pinedo & Marcos Singer, 1999. "A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(1), pages 1-17, February.
- Zijm, W. H. M. & Buitenhek, R., 1996. "Capacity planning and lead time management," International Journal of Production Economics, Elsevier, vol. 46(1), pages 165-179, December.
- Braune, R. & Zäpfel, G. & Affenzeller, M., 2012. "An exact approach for single machine subproblems in shifting bottleneck procedures for job shops with total weighted tardiness objective," European Journal of Operational Research, Elsevier, vol. 218(1), pages 76-85.
- Murat Güngör, 2023. "A note on the shifting bottleneck procedure for job shop scheduling," Journal of Scheduling, Springer, vol. 26(4), pages 399-402, August.
- Mukherjee, Saral & Chatterjee Ashis K, 2002. "Applying Machine Based Decomposition in 2-Machine Flow Shops," IIMA Working Papers WP2002-08-05, Indian Institute of Management Ahmedabad, Research and Publication Department.
- Jain, A. S. & Meeran, S., 1999. "Deterministic job-shop scheduling: Past, present and future," European Journal of Operational Research, Elsevier, vol. 113(2), pages 390-434, March.
- C N Potts & J D Whitehead, 2007. "Heuristics for a coupled-operation scheduling problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(10), pages 1375-1388, October.
- Yiyo Kuo & Sheng-I Chen & Yen-Hung Yeh, 2020. "Single machine scheduling with sequence-dependent setup times and delayed precedence constraints," Operational Research, Springer, vol. 20(2), pages 927-942, June.
- Marc R. Lambrecht & Philip L. Ivens & Nico J. Vandaele, 1998. "ACLIPS: A Capacity and Lead Time Integrated Procedure for Scheduling," Management Science, INFORMS, vol. 44(11-Part-1), pages 1548-1561, November.
- El-Bouri, A. & Azizi, N. & Zolfaghari, S., 2007. "A comparative study of a new heuristic based on adaptive memory programming and simulated annealing: The case of job shop scheduling," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1894-1910, March.
- Mukherjee, Saral & Chatterjee, A.K., 2007. "On the representation of the one machine sequencing problem in the shifting bottleneck heuristic," European Journal of Operational Research, Elsevier, vol. 182(1), pages 475-479, October.
- Guidong Zhu & Jonathan F. Bard & Gang Yu, 2006. "A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem," INFORMS Journal on Computing, INFORMS, vol. 18(3), pages 377-390, August.
- Sheen, Gwo-Ji & Liao, Lu-Wen, 2007. "A branch and bound algorithm for the one-machine scheduling problem with minimum and maximum time lags," European Journal of Operational Research, Elsevier, vol. 181(1), pages 102-116, August.
- Egon Balas & Alkis Vazacopoulos, 1998. "Guided Local Search with Shifting Bottleneck for Job Shop Scheduling," Management Science, INFORMS, vol. 44(2), pages 262-275, February.
More about this item
Keywords
job shop scheduling; delayed precedence constraints; Shifting Bottleneck Procedure;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:41:y:1995:i:1:p:94-109. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.