Optimum Checking Schedules for Systems Subject to Random Failure
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.21.3.256
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- R Jiang & A K S Jardine, 2005. "Two optimization models of the optimum inspection problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(10), pages 1176-1183, October.
- Nakagawa, T. & Mizutani, S., 2009. "A summary of maintenance policies for a finite interval," Reliability Engineering and System Safety, Elsevier, vol. 94(1), pages 89-96.
- Ahmadi, Reza & Wu, Shaomin, 2017. "A novel data-driven approach to optimizing replacement policy," Reliability Engineering and System Safety, Elsevier, vol. 167(C), pages 506-516.
- Jonathan E. Helm & Mariel S. Lavieri & Mark P. Van Oyen & Joshua D. Stein & David C. Musch, 2015. "Dynamic Forecasting and Control Algorithms of Glaucoma Progression for Clinician Decision Support," Operations Research, INFORMS, vol. 63(5), pages 979-999, October.
- Darghouth, M.N. & Chelbi, Anis & Ait-kadi, Daoud, 2012. "A profit assessment model for equipment inspection and replacement under renewing free replacement warranty policy," International Journal of Production Economics, Elsevier, vol. 135(2), pages 899-906.
- Mesak, Hani I. & Zhang, Hongkai & Pullis, Joe M., 2010. "On optimal service capacity allocation policy in an advance selling environment in continuous time," European Journal of Operational Research, Elsevier, vol. 203(2), pages 505-512, June.
- B. C. Giri & T Chakraborty, 2007. "Optimal production, maintenance, and warranty strategies for item sold with rebate combination warranty," Journal of Risk and Reliability, , vol. 221(4), pages 257-264, December.
- Leung, Francis Kit-nam, 2001. "Inspection schedules when the lifetime distribution of a single-unit system is completely unknown," European Journal of Operational Research, Elsevier, vol. 132(1), pages 106-115, July.
- Fakher, Hossein Beheshti & Nourelfath, Mustapha & Gendreau, Michel, 2018. "Integrating production, maintenance and quality: A multi-period multi-product profit-maximization model," Reliability Engineering and System Safety, Elsevier, vol. 170(C), pages 191-201.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:21:y:1974:i:3:p:256-260. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.