IDEAS home Printed from https://ideas.repec.org/a/ids/ijsoma/v38y2021i3p395-418.html
   My bibliography  Save this article

A two-step dynamic scheduling and assignment method for tooling original design manufacturers

Author

Listed:
  • Chieh Lee
  • Xun Xu
  • Ming-Feng Yang
  • Yaning Yang

Abstract

Tooling original design manufacturers have to meet highly customised product design requirements and provide a reliable delivery time for their buyers. For such mass customised tooling, high uncertainties and complexity are inevitable in the manufacturing process, especially in the labour-intensive final assembly department. We propose a two-step dynamic method that helps the tooling manufacturer in scheduling and assigning jobs at its assembling department. First, the algorithm creates a queue for incoming orders based on the bottleneck sector with a modified critical ratio (mCR). Second, the orders are assigned to assembling teams by the Hungarian method based on the availability and competitive advantage of each team. This method allows managers to update each operations team on-site, reduce the statistical dependency, and avoid work-in-process inventory build-up in the production system. In a numerical study, we illustrate the effectiveness and cost reduction potential of our method.

Suggested Citation

  • Chieh Lee & Xun Xu & Ming-Feng Yang & Yaning Yang, 2021. "A two-step dynamic scheduling and assignment method for tooling original design manufacturers," International Journal of Services and Operations Management, Inderscience Enterprises Ltd, vol. 38(3), pages 395-418.
  • Handle: RePEc:ids:ijsoma:v:38:y:2021:i:3:p:395-418
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=113606
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijsoma:v:38:y:2021:i:3:p:395-418. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=150 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.