Impact of varying levels of setup time on the performance of algorithms for scheduling a flow shop with sequence dependent setup time

Author

Listed:
  • Rajesh Vanchipura
  • R. Sridharan

Abstract

This paper presents a comparative study of two algorithms for the flow shop scheduling problem with sequence dependent setup time. The objective is to investigate the effect of setup time on makespan criterion under varying proportions of setup time. The two constructive algorithms used in the study involve a completely different approach in constructing the sequence. The first algorithm is processing time-based and the second algorithm setup time-based. Taillard benchmark flow shop problems are used for the development of benchmark problems for flow shop scheduling with sequence dependent setup time. Eight different levels of setup time matrices are developed for each problem size. The two algorithms are tested for the 960 problem instances developed. The results are analysed graphically and statistically for the varying levels of setup time. The analysis reveals that the setup time-based algorithm improves its performance when the setup time increases as a percentage of processing time. The results of statistical analysis validate the variability in performance of the two algorithms considered at different levels of setup time.

Suggested Citation

  • Rajesh Vanchipura & R. Sridharan, 2013. "Impact of varying levels of setup time on the performance of algorithms for scheduling a flow shop with sequence dependent setup time," International Journal of Services and Operations Management, Inderscience Enterprises Ltd, vol. 14(4), pages 421-444.
  • Handle: RePEc:ids:ijsoma:v:14:y:2013:i:4:p:421-444
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=52837
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Allahverdi, Ali, 2015. "The third comprehensive survey on scheduling problems with setup times/costs," European Journal of Operational Research, Elsevier, vol. 246(2), pages 345-378.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijsoma:v:14:y:2013:i:4:p:421-444. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=150 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.