IDEAS home Printed from https://ideas.repec.org/a/ids/ijisen/v4y2009i5p502-535.html
   My bibliography  Save this article

Performance analysis of scheduling rules in resource-constrained multiple projects

Author

Listed:
  • Balasubramanian Kanagasabapathi
  • Chandrasekharan Rajendran
  • Kuppuswamy Ananthanarayanan

Abstract

In the Resource-Constrained Multi-Project Scheduling (RCMPS) literature, studies on scheduling involving the minimisation of the maximum tardiness of multiple projects are rather limited. This paper, therefore, analyses the performance of the existing and newly proposed scheduling rules in the static RCMPS environment by considering performance measures involving Mean Tardiness (MT) and the Maximum Tardiness (MaxT) of projects. The present work evaluates scheduling rules that consider project due-dates, operation/activity duration times, operation/activity due-dates, project slack and activity slack, and presents the results of performance evaluation.

Suggested Citation

  • Balasubramanian Kanagasabapathi & Chandrasekharan Rajendran & Kuppuswamy Ananthanarayanan, 2009. "Performance analysis of scheduling rules in resource-constrained multiple projects," International Journal of Industrial and Systems Engineering, Inderscience Enterprises Ltd, vol. 4(5), pages 502-535.
  • Handle: RePEc:ids:ijisen:v:4:y:2009:i:5:p:502-535
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=24156
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. M. Suresh & Pankaj Dutta & Karuna Jain, 2015. "Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 32(06), pages 1-30, December.
    2. Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Fynes, Brian, 2015. "Resource allocation in multi-class dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 247(3), pages 879-894.
    3. Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Tavakkoli-Moghaddam, Reza, 2011. "Resource allocation in dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 215(3), pages 670-678, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijisen:v:4:y:2009:i:5:p:502-535. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=188 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.