Scheduling a bi-criteria flowshop manufacturing cell with sequence-dependent family setup times

Author

Listed:
  • Shih-Wei Lin
  • Kuo-Ching Ying

Abstract

Flowshop manufacturing cell scheduling problems (FMCSPs) with sequence-dependent family setup times (SDFSTs) have become a key area in the field of scheduling. Though the need to consider multiple criteria in real-world scheduling is widely recognised, most of the currently available algorithms for FMCSPs with SDFSTs only deal with the optimisation of a single performance criterion. In this study, a two-level multi-start simulated annealing (TLMSA) heuristic was presented for this problem with the objectives of simultaneously minimising makespan and total flow time (or total tardiness). To validate the performance of the proposed approach, the obtained sets of non-dominated solutions were evaluated by seven multi-objective performance indicators. The computational results showed that the proposed TLMSA significantly outperforms the benchmark algorithm in terms of the seven performance indicators. It is believed that it can serve as a new benchmark approach for future research on the two FMCSPs with SDFSTs addressed in this study. [Received 15 January 2010; Revised 20 May 2010; 15 November 2010; Accepted 24 February 2011]

Suggested Citation

  • Shih-Wei Lin & Kuo-Ching Ying, 2012. "Scheduling a bi-criteria flowshop manufacturing cell with sequence-dependent family setup times," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 6(4), pages 474-496.
  • Handle: RePEc:ids:eujine:v:6:y:2012:i:4:p:474-496
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=47666
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Allahverdi, Ali, 2015. "The third comprehensive survey on scheduling problems with setup times/costs," European Journal of Operational Research, Elsevier, vol. 246(2), pages 345-378.
    2. Vahid Riahi & Morteza Kazemi, 2018. "A new hybrid ant colony algorithm for scheduling of no-wait flowshop," Operational Research, Springer, vol. 18(1), pages 55-74, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:eujine:v:6:y:2012:i:4:p:474-496. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=210 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.