IDEAS home Printed from https://ideas.repec.org/a/ids/eujine/v10y2016i3p301-322.html
   My bibliography  Save this article

Tactical project planning under uncertainty: fuzzy approach

Author

Listed:
  • Malek Masmoudi
  • Erwin W. Hans
  • Alain Haït

Abstract

At the tactical planning level in a multi-project environment, uncertainties are inherent to the workloads, and costs may be involved for using non-regular capacity and violating project due dates. We propose an approach to identify whether non-regular capacities might be needed to meet the projects' due dates. This problem is known as rough-cut capacity planning (RCCP) problem under uncertainty. We propose a possibilistic approach, which is based on modelling uncertain workloads with fuzzy sets. We present the resulting fuzzy rough-cut capacity planning (FRCCP), and show that we can use the possibilistic approach to provide a robust solution with a fuzzy resource loading profile that supports managers in decision making. We provide a simulated annealing approach to solve the FRCCP, and test it against several existing RCCP approaches. For the experiments we use real life instances from a shipyard maintenance centre. [Received 23 February 2015; Revised 27 May 2015; Revised 20 August 2015; Revised 12 October 2015; Accepted 17 November 2015]

Suggested Citation

  • Malek Masmoudi & Erwin W. Hans & Alain Haït, 2016. "Tactical project planning under uncertainty: fuzzy approach," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 10(3), pages 301-322.
  • Handle: RePEc:ids:eujine:v:10:y:2016:i:3:p:301-322
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=76381
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Bhaskar, Tarun & Pal, Manabendra N. & Pal, Asim K., 2011. "A heuristic method for RCPSP with fuzzy activity times," European Journal of Operational Research, Elsevier, vol. 208(1), pages 57-66, January.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Yuvraj Gajpal & Ashraf Elazouni, 2015. "Enhanced heuristic for finance-based scheduling of construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 33(7), pages 531-553, July.
    2. Yagub Alipouri & Mohammad Hassan Sebt & Abdollah Ardeshir & Mohammad Hossein Fazel Zarandi, 2020. "A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem," Operational Research, Springer, vol. 20(1), pages 197-217, March.
    3. Portoleau, Tom & Artigues, Christian & Guillaume, Romain, 2024. "Robust decision trees for the multi-mode project scheduling problem with a resource investment objective and uncertain activity duration," European Journal of Operational Research, Elsevier, vol. 312(2), pages 525-540.
    4. Balouka, Noemie & Cohen, Izack, 2021. "A robust optimization approach for the multi-mode resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 291(2), pages 457-470.
    5. Zhao, Mingxuan & Zhou, Jian & Wang, Ke & Pantelous, Athanasios A., 2023. "Project scheduling problem with fuzzy activity durations: A novel operational law based solution framework," European Journal of Operational Research, Elsevier, vol. 306(2), pages 519-534.
    6. Seddik, Yasmina & Hanzálek, Zdenek, 2017. "Match-up scheduling of mixed-criticality jobs: Maximizing the probability of jobs execution," European Journal of Operational Research, Elsevier, vol. 262(1), pages 46-59.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:eujine:v:10:y:2016:i:3:p:301-322. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=210 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.