Study of dependence of income and profit of the ore mining and processing enterprise on organisation of ore supply
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Everett, J.E., 1997. "Simulation to reduce variability in iron ore stockpiles," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 43(3), pages 563-568.
- Everett, J. E., 2001. "Iron ore production scheduling to improve product quality," European Journal of Operational Research, Elsevier, vol. 129(2), pages 355-361, March.
- James E. Everett, 1996. "Iron Ore Handling Procedures Enhance Export Quality," Interfaces, INFORMS, vol. 26(6), pages 82-94, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Everett, J. E., 2001. "Iron ore production scheduling to improve product quality," European Journal of Operational Research, Elsevier, vol. 129(2), pages 355-361, March.
- Camargo, Luis Felipe Riehs & Rodrigues, Luis Henrique & Lacerda, Daniel Pacheco & Piran, Fabio Sartori, 2018. "A method for integrated process simulation in the mining industry," European Journal of Operational Research, Elsevier, vol. 264(3), pages 1116-1129.
- Everett, J.E., 2007. "Computer aids for production systems management in iron ore mining," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 213-223, October.
- Sylvie C. Bouffard & Peter Boggis & Bryan Monk & Marianela Pereira & Keith Quan & Sandra Fleming, 2017. "Discrete-Event Simulation Modeling Unlocks Value for the Jansen Potash Project," Decision Analysis, INFORMS, vol. 48(01), pages 45-56, February.
- LaRoche-Boisvert, Mélanie & Dimitrakopoulos, Roussos & Ferland, Jacques A., 2021. "Simultaneous production scheduling and transportation optimization from mines to port under uncertain material supply," Resources Policy, Elsevier, vol. 73(C).
- Gaurav Singh & Rodolfo García-Flores & Andreas Ernst & Palitha Welgama & Meimei Zhang & Kerry Munday, 2014. "Medium-Term Rail Scheduling for an Iron Ore Mining Company," Interfaces, INFORMS, vol. 44(2), pages 222-240, April.
- Michelle L. Blom & Adrian R. Pearce & Peter J. Stuckey, 2016. "A Decomposition-Based Algorithm for the Scheduling of Open-Pit Networks Over Multiple Time Periods," Management Science, INFORMS, vol. 62(10), pages 3059-3084, October.
More about this item
Keywords
profit; price; dynamic parameters of ore supply; algorithmic model; economic and mathematical modelling;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:idp:redpoe:y:2013:i:4:p:229_236. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Alexey Rystenko (email available below). General contact details of provider: https://www.problecon.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.