IDEAS home Printed from https://ideas.repec.org/a/ibn/jsd123/v8y2015i9p139.html
   My bibliography  Save this article

Assessment of Contractors’ Mitigating Measures for Cost Overrun of Building Projects in South-Western Nigeria

Author

Listed:
  • Jacob A. B. Awolesi
  • Jonathan K. Fabi
  • Olubola A. Akinseinde

Abstract

The study examined the mitigating measures employed by contractors in southwest of Nigeria for cost overrun of building projects with a view to determining its adequacy and effectiveness. A mix of qualitative and quantitative research methods was adopted where data pertinent to the study were obtained through questionnaire survey on a sample of 32 project managers of medium sized construction firms selected from the list of 125 contractors on the register of Federation of Building and Civil Engineering Contractors located in South-West Nigeria using Simple Random Sampling method. Additional information was obtained from contracts bills of quantities and programme schedule to complement the data obtained from the questionnaire survey. Contract sums and final sums of building projects between 200 million Naira – 1.7 billion Naira handled by respondents were also collected as secondary data. Statistical Package for Social Scientists (SPSS) was employed to analyse the data for descriptive statistics while manual approach was adopted for inferential statistics of t-test. The results obtained revealed that effective site management and supervision with the highest relative importance index (RII) for adequacy of the mitigation measures was at average level and the (RII) for the effectiveness of mitigation measures adopted by contractors was very low. It also revealed that there is significant difference between initial sums and final sums of building projects at 5% significance level where the mitigation measures were taken in to consideration. The study concluded that mitigation measures adopted by contractors have not been adequate and effective in curbing cost overrun of building projects in southwest Nigeria.

Suggested Citation

  • Jacob A. B. Awolesi & Jonathan K. Fabi & Olubola A. Akinseinde, 2015. "Assessment of Contractors’ Mitigating Measures for Cost Overrun of Building Projects in South-Western Nigeria," Journal of Sustainable Development, Canadian Center of Science and Education, vol. 8(9), pages 139-139, September.
  • Handle: RePEc:ibn:jsd123:v:8:y:2015:i:9:p:139
    as

    Download full text from publisher

    File URL: https://ccsenet.org/journal/index.php/jsd/article/download/55111/29410
    Download Restriction: no

    File URL: https://ccsenet.org/journal/index.php/jsd/article/view/55111
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Brunes, Fredrik & Lind, Hans, 2014. "Policies to avoid cost overruns: Critical evaluation and recommendations," Working Paper Series 14/6, Royal Institute of Technology, Department of Real Estate and Construction Management & Banking and Finance.
    2. Kumaru Yogeswaran & Mohan Kumaraswamy & Douglas Miller, 1998. "Claims for extensions of time in civil engineering projects," Construction Management and Economics, Taylor & Francis Journals, vol. 16(3), pages 283-293.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. S.W.S.B. Dasanayaka, 2012. "Feasibility of Biomass Utilization in Sri Lanka: A Case Study Based on Regional Tea Plantation Companies," South Asian Journal of Business and Management Cases, , vol. 1(2), pages 151-167, December.
    2. Nor Azmi Bakhary & Azmi Ibrahim & Noor Akmal Adillah Ismail, 2013. "Critical Review on Improving the Claim Management Process in Malaysia," Journal of Education and Vocational Research, AMH International, vol. 4(7), pages 214-218.
    3. Dang Vo, Khoa & Thanh Nguyen, Phong & Le Hoang Thuy To Nguyen, Quyen, 2020. "Disputes in Managing Projects: A Case Study of Construction Industry in Vietnam," MPRA Paper 103436, University Library of Munich, Germany, revised 05 Jul 2020.

    More about this item

    JEL classification:

    • R00 - Urban, Rural, Regional, Real Estate, and Transportation Economics - - General - - - General
    • Z0 - Other Special Topics - - General

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ibn:jsd123:v:8:y:2015:i:9:p:139. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Canadian Center of Science and Education (email available below). General contact details of provider: https://edirc.repec.org/data/cepflch.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.