IDEAS home Printed from https://ideas.repec.org/a/hin/jnlmpe/1569029.html
   My bibliography  Save this article

Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time

Author

Listed:
  • Renqian Zhang
  • Xuefang Sun

Abstract

An extension of the integrated production-delivery lot sizing model with limited production capacity and transportation cost is investigated. We introduce the factor of overtime work into the model to improve the manufacturer’s production. In addition, when finishing a lot, the manufacturer has maintenance time to maintain and repair equipment for ensuring that the supply chain is operating continuously. By analyzing the integrated model, the solution procedure is provided to determine the optimal delivery and order policy. We conduct a numerical experiment and give sensitive analysis by varying some parameters to illustrate the problem and its solution procedure.

Suggested Citation

  • Renqian Zhang & Xuefang Sun, 2018. "Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time," Mathematical Problems in Engineering, Hindawi, vol. 2018, pages 1-10, April.
  • Handle: RePEc:hin:jnlmpe:1569029
    DOI: 10.1155/2018/1569029
    as

    Download full text from publisher

    File URL: http://downloads.hindawi.com/journals/MPE/2018/1569029.pdf
    Download Restriction: no

    File URL: http://downloads.hindawi.com/journals/MPE/2018/1569029.xml
    Download Restriction: no

    File URL: https://libkey.io/10.1155/2018/1569029?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Song Jiu, 2021. "A two-phase approach for integrating preventive maintenance with production and delivery in an unreliable coal mine," Journal of Heuristics, Springer, vol. 27(6), pages 991-1020, December.
    2. A. S. Xanthopoulos & S. Vlastos & D. E. Koulouriotis, 2022. "Coordinating production, inspection and maintenance decisions in a stochastic manufacturing system with deterioration failures," Operational Research, Springer, vol. 22(5), pages 5707-5732, November.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hin:jnlmpe:1569029. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Mohamed Abdelhakeem (email available below). General contact details of provider: https://www.hindawi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.