Author
Listed:
- Inoussa Legrene
(Systems Engineering Department, École de Technologie Supérieure, Montreal, QC H3C 1K3, Canada)
- Tony Wong
(Systems Engineering Department, École de Technologie Supérieure, Montreal, QC H3C 1K3, Canada)
- Nicolas Mary
(Electrical Engineering Department, École de Technologie Supérieure, Montreal, QC H3C 1K3, Canada)
- Louis-A. Dessaint
(Electrical Engineering Department, École de Technologie Supérieure, Montreal, QC H3C 1K3, Canada)
Abstract
The global adoption of hybrid renewable energy systems (HRESs) is accelerating as a strategic response to escalating energy demands and the imperative to mitigate greenhouse gas emissions. Despite the development of various technological tools, such as pre-feasibility analysis, sizing, and simulation tools, challenges persist due to their limited flexibility in modifying system architectures and their typically long computation times, which hinder their practical efficiency. This study introduces a novel hybrid method that integrates the Branch and Bound (BB) heuristic search algorithm with the k-Nearest Neighbors (kNN) algorithm to drastically reduce the simulation time of microgrid models in Simulink. Validation considering four distinct case studies reveals that our method can decrease the simulation time by up to 94.68% while maintaining an acceptable accuracy. Specifically, simulation times in certain cases were reduced from approximately 21,780 and 118,580 s to 1442.7969 and 6306.0625 s, respectively. This significant reduction facilitates the rapid evaluation and selection of optimal HRES configurations, enhancing the efficiency of both editable and non-editable systems. Through streamlining the simulation process, this approach not only accelerates the design and analysis phases but also supports the broader adoption and deployment of HRESs, which is critical for achieving a sustainable future. This advancement offers a robust and efficient methodology for optimizing simulation times, thereby addressing a key bottleneck in the development and implementation of hybrid renewable energy solutions.
Suggested Citation
Inoussa Legrene & Tony Wong & Nicolas Mary & Louis-A. Dessaint, 2025.
"Reduction in Microgrid Topology Selection Time via Hybrid Branch and Bound and k-Nearest Neighbors Techniques,"
Mathematics, MDPI, vol. 13(3), pages 1-16, January.
Handle:
RePEc:gam:jmathe:v:13:y:2025:i:3:p:360-:d:1574478
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:13:y:2025:i:3:p:360-:d:1574478. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.