A Combined Fuzzy Optimization Model for the Location of an Intelligent Energy-Efficient Manufacturing Industrial Park
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Chou, Shuo-Yan & Chang, Yao-Hui & Shen, Chun-Ying, 2008. "A fuzzy simple additive weighting system under group decision-making for facility location selection with objective/subjective attributes," European Journal of Operational Research, Elsevier, vol. 189(1), pages 132-145, August.
- Kabir, Golam & Sumi, Razia Sultana, 2014. "Power substation location selection using fuzzy analytic hierarchy process and PROMETHEE: A case study from Bangladesh," Energy, Elsevier, vol. 72(C), pages 717-730.
- Shao, Meng & Zhao, Yuanxu & Sun, Jinwei & Han, Zhixin & Shao, Zhuxiao, 2023. "A decision framework for tidal current power plant site selection based on GIS-MCDM: A case study in China," Energy, Elsevier, vol. 262(PB).
- Shorabeh, Saman Nadizadeh & Firozjaei, Hamzeh Karimi & Firozjaei, Mohammad Karimi & Jelokhani-Niaraki, Mohammadreza & Homaee, Mehdi & Nematollahi, Omid, 2022. "The site selection of wind energy power plant using GIS-multi-criteria evaluation from economic perspectives," Renewable and Sustainable Energy Reviews, Elsevier, vol. 168(C).
- Ayough, Ashkan & Boshruei, Setareh & Khorshidvand, Behrooz, 2022. "A new interactive method based on multi-criteria preference degree functions for solar power plant site selection," Renewable Energy, Elsevier, vol. 195(C), pages 1165-1173.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Xu, Jiuping & Song, Xiaoling & Wu, Yimin & Zeng, Ziqiang, 2015. "GIS-modelling based coal-fired power plant site identification and selection," Applied Energy, Elsevier, vol. 159(C), pages 520-539.
- Zhou, Jianli & Liu, Dandan & Sha, Ru & Sun, Jingbing & Wang, Yubao & Wu, Yunna, 2024. "Geospatial simulation and decision optimization towards identifying the layout suitability and priority for wind-photovoltaic-hydrogen-ammonia project: An empirical study in China," Energy, Elsevier, vol. 286(C).
- Deveci, Muhammet & Cali, Umit & Kucuksari, Sadik & Erdogan, Nuh, 2020. "Interval type-2 fuzzy sets based multi-criteria decision-making model for offshore wind farm development in Ireland," Energy, Elsevier, vol. 198(C).
- Thanh-Lam Nguyen, 2017. "Methods in Ranking Fuzzy Numbers: A Unified Index and Comparative Reviews," Complexity, Hindawi, vol. 2017, pages 1-13, July.
- Rihab Khemiri & Khaoula Elbedoui-Maktouf & Bernard Grabot & Belhassen Zouari, 2017. "A fuzzy multi-criteria decision making approach for managing performance and risk in integrated procurement-production planning," Post-Print hal-01758604, HAL.
- Jihane El Ouadi & Hanae Errousso & Nicolas Malhene & Siham Benhadou & Hicham Medromi, 2022. "A machine-learning based hybrid algorithm for strategic location of urban bundling hubs to support shared public transport," Quality & Quantity: International Journal of Methodology, Springer, vol. 56(5), pages 3215-3258, October.
- Zhiming Lu & Youting Li & Guying Zhuo & Chuanbo Xu, 2023. "Configuration Optimization of Hydrogen-Based Multi-Microgrid Systems under Electricity Market Trading and Different Hydrogen Production Strategies," Sustainability, MDPI, vol. 15(8), pages 1-23, April.
- Yunna Wu & Meng Yang & Haobo Zhang & Kaifeng Chen & Yang Wang, 2016. "Optimal Site Selection of Electric Vehicle Charging Stations Based on a Cloud Model and the PROMETHEE Method," Energies, MDPI, vol. 9(3), pages 1-20, March.
- Muhamet Aliu & Arbana Sahiti & Arben Sahiti, 2016. "Business Environment and Accounting System in Kosovo: Comparison of Different Periods," European Journal of Economics and Business Studies Articles, Revistia Research and Publishing, vol. 2, ejes_v2_i.
- Chunchang Zhang & Hu Sun & Yuanyuan Zhang & Gen Li & Shibo Li & Junyu Chang & Gongqian Shi, 2023. "Fire Accident Risk Analysis of Lithium Battery Energy Storage Systems during Maritime Transportation," Sustainability, MDPI, vol. 15(19), pages 1-12, September.
- Gul, Muhammet & Yucesan, Melih, 2022. "Performance evaluation of Turkish Universities by an integrated Bayesian BWM-TOPSIS model," Socio-Economic Planning Sciences, Elsevier, vol. 80(C).
- Kannan Govindan & R. Sivakumar, 2016. "Green supplier selection and order allocation in a low-carbon paper industry: integrated multi-criteria heterogeneous decision-making and multi-objective linear programming approaches," Annals of Operations Research, Springer, vol. 238(1), pages 243-276, March.
- Yunna Wu & Chao Xie & Chuanbo Xu & Fang Li, 2017. "A Decision Framework for Electric Vehicle Charging Station Site Selection for Residential Communities under an Intuitionistic Fuzzy Environment: A Case of Beijing," Energies, MDPI, vol. 10(9), pages 1-25, August.
- Fei Tian & Xuelin Li & Mengdi Liu & Changfa Xia & Xudong Guo & Xiaocheng Fang & Lei Huang, 2024. "Application of a GIS-Based Multi-Criteria Decision-Making Approach to the Siting of Ocean Thermal Energy Conversion Power Plants: A Case Study of the Xisha Sea Area, China," Energies, MDPI, vol. 17(20), pages 1-19, October.
- Andrius Tamošiūnas, 2023. "Selecting Rooftop Solar Photovoltaic Modules by Measuring Their Attractiveness by a Categorical-Based Evaluation Technique (MACBETH): The Case of Lithuania," Energies, MDPI, vol. 16(7), pages 1-22, March.
- Long Zhang & Wuliyasu Bai & Jing Yu & Linmao Ma & Jingzheng Ren & Weishi Zhang & Yuanzheng Cui, 2018. "Critical Mineral Security in China: An Evaluation Based on Hybrid MCDM Methods," Sustainability, MDPI, vol. 10(11), pages 1-21, November.
- Kannan Govindan & R. Sivakumar, 2016. "Green supplier selection and order allocation in a low-carbon paper industry: integrated multi-criteria heterogeneous decision-making and multi-objective linear programming approaches," Annals of Operations Research, Springer, vol. 238(1), pages 243-276, March.
- Bhuvnesh Sharma & M. Ramkumar & Nachiappan Subramanian & Bharat Malhotra, 2019. "Dynamic temporary blood facility location-allocation during and post-disaster periods," Annals of Operations Research, Springer, vol. 283(1), pages 705-736, December.
- Ziemba, Paweł, 2022. "Uncertain Multi-Criteria analysis of offshore wind farms projects investments – Case study of the Polish Economic Zone of the Baltic Sea," Applied Energy, Elsevier, vol. 309(C).
- Toly Chen & Chungwei Ou & Yu-Cheng Lin, 2019. "A fuzzy polynomial fitting and mathematical programming approach for enhancing the accuracy and precision of productivity forecasting," Computational and Mathematical Organization Theory, Springer, vol. 25(2), pages 85-107, June.
More about this item
Keywords
manufacturing industrial park-site selection; optimization model; interval intuitionistic fuzzy sets; fuzzy TOPSIS; fuzzy VIKOR;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:15:y:2022:i:24:p:9346-:d:998990. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.