A Fuzzy Approach for Projects Evaluation and Selection; an Iranian Auto Manufacturer Case Study
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Beskese, Ahmet & Kahraman, Cengiz & Irani, Zahir, 2004. "Quantification of flexibility in advanced manufacturing systems using fuzzy concept," International Journal of Production Economics, Elsevier, vol. 89(1), pages 45-56, May.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Seebacher, Gottfried & Winkler, Herwig, 2014. "Evaluating flexibility in discrete manufacturing based on performance and efficiency," International Journal of Production Economics, Elsevier, vol. 153(C), pages 340-351.
- Llorens, F. Javier & Molina, Luis M. & Verdu, Antonio J., 2005. "Flexibility of manufacturing systems, strategic change and performance," International Journal of Production Economics, Elsevier, vol. 98(3), pages 273-289, December.
- Choe, Pilsung & Tew, Jeffrey D. & Tong, Songzhen, 2015. "Effect of cognitive automation in a material handling system on manufacturing flexibility," International Journal of Production Economics, Elsevier, vol. 170(PC), pages 891-899.
- Khalid Aljohani & Russell G. Thompson, 2018. "A Stakeholder-Based Evaluation of the Most Suitable and Sustainable Delivery Fleet for Freight Consolidation Policies in the Inner-City Area," Sustainability, MDPI, vol. 11(1), pages 1-27, December.
- Lin, Ching-Torng & Chiu, Hero & Tseng, Yi-Hong, 2006. "Agility evaluation using fuzzy logic," International Journal of Production Economics, Elsevier, vol. 101(2), pages 353-368, June.
- Azadegan, Arash & Porobic, Lejla & Ghazinoory, Sepehr & Samouei, Parvaneh & Saman Kheirkhah, Amir, 2011. "Fuzzy logic in manufacturing: A review of literature and a specialized application," International Journal of Production Economics, Elsevier, vol. 132(2), pages 258-270, August.
- Suman Gothwal & Tilak Raj, 2017. "Analyzing the factors affecting the flexibility in FMS using weighted interpretive structural modeling (WISM) approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 408-422, June.
- Čičak Josip & Vašiček Davor, 2019. "Determining the Level of Accounting Conservatism through the Fuzzy Logic System," Business Systems Research, Sciendo, vol. 10(1), pages 88-101, April.
- Bonfatti, M. & Caridi, M. & Schiavina, L., 2006. "A fuzzy model for load-oriented manufacturing control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 502-513, December.
- Chang, An-Yuan, 2007. "On the measurement of routing flexibility: A multiple attribute approach," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 122-136, September.
- Sushil, 2020. "Interpretive multi-criteria ranking of production systems with ordinal weights and transitive dominance relationships," Annals of Operations Research, Springer, vol. 290(1), pages 677-695, July.
- Kulak, Osman & Kahraman, Cengiz, 2005. "Multi-attribute comparison of advanced manufacturing systems using fuzzy vs. crisp axiomatic design approach," International Journal of Production Economics, Elsevier, vol. 95(3), pages 415-424, March.
More about this item
Keywords
Project evaluation; Fuzzy cash flow; Fuzzy multi criteria decision making.;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eut:journl:v:11:y:2006:i:1:p:171. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: [z.rahimalipour] (email available below). General contact details of provider: https://edirc.repec.org/data/fecutir.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.