IDEAS home Printed from https://ideas.repec.org/a/eme/ijppmp/v58y2009i2p160-173.html
   My bibliography  Save this article

Identifying key performance indicators for use in control of pre‐project stage process in construction

Author

Listed:
  • Tatsiana Haponava
  • Saad Al‐Jibouri

Abstract

Purpose - The need for measuring construction project performance has led to development and implementation of various key performance indicators (KPIs). This paper aims to present and discuss the results of a pilot study and interviews to identify process‐based KPIs for use in control of the pre‐project stage. Design/methodology/approach - Initially, the process of the pre‐project stage was mapped to define its main generic sub‐processes and outputs based on the literature review. The process map was then verified through a pilot study. Based on the verified sub‐processes, a number of process‐based KPIs were identified and later validated by experts during the interviews. Findings - As a consequence of the refinement process due to the results of the pilot study and the interviews, the process‐based KPIs for the pre‐project stage were identified and the main issues they have to encompass were discussed. Originality/value - The identified KPIs offer a significant step towards process control within the pre‐project stage. They provide a basis for further development to improve process transparency and to explain the relationships between the various sub‐processes.

Suggested Citation

  • Tatsiana Haponava & Saad Al‐Jibouri, 2009. "Identifying key performance indicators for use in control of pre‐project stage process in construction," International Journal of Productivity and Performance Management, Emerald Group Publishing Limited, vol. 58(2), pages 160-173, January.
  • Handle: RePEc:eme:ijppmp:v:58:y:2009:i:2:p:160-173
    DOI: 10.1108/17410400910928743
    as

    Download full text from publisher

    File URL: https://www.emerald.com/insight/content/doi/10.1108/17410400910928743/full/html?utm_source=repec&utm_medium=feed&utm_campaign=repec
    Download Restriction: Access to full text is restricted to subscribers

    File URL: https://www.emerald.com/insight/content/doi/10.1108/17410400910928743/full/pdf?utm_source=repec&utm_medium=feed&utm_campaign=repec
    Download Restriction: Access to full text is restricted to subscribers

    File URL: https://libkey.io/10.1108/17410400910928743?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Sungmin Yun & Wooyong Jung, 2017. "Benchmarking Sustainability Practices Use throughout Industrial Construction Project Delivery," Sustainability, MDPI, vol. 9(6), pages 1-20, June.
    2. Adam Wyszomirski & Bartosz Ostapko & Marcin Olkiewicz & Radosław Wolniak, 2021. "The Analysis of Dependencies Between Extraction and Resource Consumption in 2008-2014 on the Example of Ostrowite Gravel Pit," European Research Studies Journal, European Research Studies Journal, vol. 0(Special 1), pages 311-324.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eme:ijppmp:v:58:y:2009:i:2:p:160-173. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Emerald Support (email available below). General contact details of provider: .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.