Assessing the wind resource in complex terrains with the level of accuracy required by industry is not a trivial task. The present study critically analyzes the different elements involved in the process and how they affect the predicted Annual Energy Production (AEP) of a wind farm. Five different sites in Italy, for which the installing company had a posteriori AEP data available, are considered. All sites are modeled with the windPRO software. To separate the effects related to the quality of experimental measurements from those due to the selected wind modeling techniques, two different approaches were followed. In the “horizontal” one, the minimum amount of wind data common to all installation sites were used, i.e., the measurements of one mast at one selected altitude for a single full year, thus highlighting the role of the terrain modelling. In the “vertical” approach, the analysis focused on the site with the most complex terrain, using wind data of different quality and duration, as well as different processing techniques, from the ubiquitous WAsP to WAsP-CFD. The results of the study confirm that, even in presence of high-quality measurements and a standard workflow, the accuracy of the farm's AEP estimation is strongly site-dependent. For mildly-complex terrains, the lack of accuracy in mast data can be compensated with a more advanced spatial scaling method, and vice versa. On the other hand, in presence of steep slopes or sneaky ridges, attention must be paid to both the experimental and modelling components. A scaling approach based on Computational Fluid Dynamics (CFD) is mandatory. In all cases, thermal effects such as atmospheric stability must be carefully evaluated and included in the assessment process.
Suggested Citation
Melani, Pier Francesco & Di Pietro, Federica & Motta, Maurizio & Giusti, Marco & Bianchini, Alessandro, 2023.
"A critical analysis of the uncertainty in the production estimation of wind parks in complex terrains,"
Renewable and Sustainable Energy Reviews, Elsevier, vol. 181(C).
Handle:
RePEc:eee:rensus:v:181:y:2023:i:c:s136403212300196x
DOI: 10.1016/j.rser.2023.113339
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:rensus:v:181:y:2023:i:c:s136403212300196x. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/600126/description#description .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.