Optimal operation and maintenance scheduling in m-out-of-n standby systems with reusable elements
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ress.2021.107582
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Wang, Xiaolin & Li, Lishuai & Xie, Min, 2020. "An unpunctual preventive maintenance policy under two-dimensional warranty," European Journal of Operational Research, Elsevier, vol. 282(1), pages 304-318.
- Fitouhi, Mohamed-Chahir & Nourelfath, Mustapha, 2014. "Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems," Reliability Engineering and System Safety, Elsevier, vol. 121(C), pages 175-186.
- Yang, Li & Ye, Zhi-sheng & Lee, Chi-Guhn & Yang, Su-fen & Peng, Rui, 2019. "A two-phase preventive maintenance policy considering imperfect repair and postponed replacement," European Journal of Operational Research, Elsevier, vol. 274(3), pages 966-977.
- Eryilmaz, Serkan & Kan, Cihangir, 2019. "Reliability and optimal replacement policy for an extreme shock model with a change point," Reliability Engineering and System Safety, Elsevier, vol. 190(C), pages 1-1.
- Lin, Boliang & Wu, Jianping & Lin, Ruixi & Wang, Jiaxi & Wang, Hui & Zhang, Xuhui, 2019. "Optimization of high-level preventive maintenance scheduling for high-speed trains," Reliability Engineering and System Safety, Elsevier, vol. 183(C), pages 261-275.
- Sheu, Shey-Huei & Liu, Tzu-Hsin & Zhang, Zhe-George, 2019. "Extended optimal preventive replacement policies with random working cycle," Reliability Engineering and System Safety, Elsevier, vol. 188(C), pages 398-415.
- Sofia Panagiotidou, 2020. "Joint optimization of spare parts ordering and age-based preventive replacement," International Journal of Production Research, Taylor & Francis Journals, vol. 58(20), pages 6283-6299, October.
- Wang, Naichao & Hu, Jiawen & Ma, Lin & Xiao, Boping & Liao, Haitao, 2020. "Availability Analysis and Preventive Maintenance Planning for Systems with General Time Distributions," Reliability Engineering and System Safety, Elsevier, vol. 201(C).
- Ma, Xiaoyang & Liu, Bin & Yang, Li & Peng, Rui & Zhang, Xiaodong, 2020. "Reliability analysis and condition-based maintenance optimization for a warm standby cooling system," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
- Yen-Luan Chen, 2019. "Optimal scheduling replacement policies for a system with multiple random works," Communications in Statistics - Theory and Methods, Taylor & Francis Journals, vol. 48(3), pages 676-688, February.
- Levitin, Gregory & Finkelstein, Maxim & Dai, Yuanshun, 2018. "Heterogeneous standby systems with shocks-driven preventive replacements," European Journal of Operational Research, Elsevier, vol. 266(3), pages 1189-1197.
- Satoshi Mizutani & Wenjie Dong & Xufeng Zhao & Toshio Nakagawa, 2020. "Preventive replacement policies with products update announcements," Communications in Statistics - Theory and Methods, Taylor & Francis Journals, vol. 49(15), pages 3821-3833, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Levitin, Gregory & Xing, Liudong & Dai, Yanshun, 2021. "Joint optimal mission aborting and replacement and maintenance scheduling in dual-unit standby systems," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
- Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2021. "Influence of storage on mission success probability of m-out-of-n standby systems with reusable elements," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
- Levitin, Gregory & Xing, Liudong & Dai, Yanshun, 2022. "Minimum cost replacement and maintenance scheduling in dual-dissimilar-unit standby systems," Reliability Engineering and System Safety, Elsevier, vol. 218(PA).
- Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Heterogeneous 1-out-of-n standby systems with limited unit operation time," Reliability Engineering and System Safety, Elsevier, vol. 224(C).
- Lin, Zhixian & Tao, Longlong & Wang, Shaoxuan & Yong, Nuo & Xia, Dongqin & Wang, Jianye & Ge, Daochuan, 2024. "A subset simulation analysis framework for rapid reliability evaluation of series-parallel cold standby systems," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
- Oszczypała, Mateusz & Konwerski, Jakub & Ziółkowski, Jarosław & Małachowski, Jerzy, 2024. "Reliability analysis and redundancy optimization of k-out-of-n systems with random variable k using continuous time Markov chain and Monte Carlo simulation," Reliability Engineering and System Safety, Elsevier, vol. 242(C).
- Levitin, Gregory & Xing, Liudong & Xiang, Yanping, 2021. "Optimal multiple replacement and maintenance scheduling in two-unit systems," Reliability Engineering and System Safety, Elsevier, vol. 213(C).
- Cheng, Dawei & Lu, Zhong & Zhou, Jia & Liang, Xihui, 2023. "An optimizing maintenance policy for airborne redundant systems operating with faults by using Markov process and NSGA-II," Reliability Engineering and System Safety, Elsevier, vol. 236(C).
- Vladimir Rykov & Nika Ivanova & Dmitry Kozyrev, 2021. "Application of Decomposable Semi-Regenerative Processes to the Study of k -out-of- n Systems," Mathematics, MDPI, vol. 9(16), pages 1-23, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Levitin, Gregory & Xing, Liudong & Dai, Yanshun, 2022. "Minimum cost replacement and maintenance scheduling in dual-dissimilar-unit standby systems," Reliability Engineering and System Safety, Elsevier, vol. 218(PA).
- Levitin, Gregory & Xing, Liudong & Xiang, Yanping, 2021. "Optimal multiple replacement and maintenance scheduling in two-unit systems," Reliability Engineering and System Safety, Elsevier, vol. 213(C).
- Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2021. "Influence of storage on mission success probability of m-out-of-n standby systems with reusable elements," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
- Levitin, Gregory & Xing, Liudong & Dai, Yanshun, 2021. "Joint optimal mission aborting and replacement and maintenance scheduling in dual-unit standby systems," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
- Zhang, Fengxia & Shen, Jingyuan & Liao, Haitao & Ma, Yizhong, 2021. "Optimal preventive maintenance policy for a system subject to two-phase imperfect inspections," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
- Zhao, Xian & He, Zongda & Wu, Yaguang & Qiu, Qingan, 2022. "Joint optimization of condition-based performance control and maintenance policies for mission-critical systems," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
- Zhang, Qin & Fang, Zhigeng & Cai, Jiajia, 2021. "Preventive replacement policies with multiple missions and maintenance triggering approaches," Reliability Engineering and System Safety, Elsevier, vol. 213(C).
- Levitin, Gregory & Finkelstein, Maxim & Dai, Yuanshun, 2020. "Optimal preventive replacement policy for homogeneous cold standby systems with reusable elements," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
- Zhang, Qin & Fang, Zhigeng & Cai, Jiajia, 2021. "Extended block replacement policies with mission durations and maintenance triggering approaches," Reliability Engineering and System Safety, Elsevier, vol. 207(C).
- Ardakan, Mostafa Abouei & Amini, Hanieh & Juybari, Mohammad N., 2022. "Prescheduled switching time: A new strategy for systems with standby components," Reliability Engineering and System Safety, Elsevier, vol. 218(PB).
- Xiaoyue Wang & Ru Ning & Xian Zhao, 2023. "Generalized mixed shock model for multi-component systems in the shock environment with a change point," Journal of Risk and Reliability, , vol. 237(4), pages 619-635, August.
- Shang, Lijun & Liu, Baoliang & Qiu, Qingan & Yang, Li, 2023. "Three-dimensional warranty and post-warranty maintenance of products with monitored mission cycles," Reliability Engineering and System Safety, Elsevier, vol. 239(C).
- Levitin, Gregory & Finkelstein, Maxim & Dai, Yuanshun, 2021. "Optimization of cyclic preventive replacement in homogeneous warm-standby system with reusable elements exposed to shocks," Reliability Engineering and System Safety, Elsevier, vol. 207(C).
- Zhang, Fengxia & Shen, Jingyuan & Ma, Yizhong, 2020. "Optimal maintenance policy considering imperfect repairs and non-constant probabilities of inspection errors," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
- Wang, Jingjing & Qiu, Qingan & Wang, Huanhuan, 2021. "Joint optimization of condition-based and age-based replacement policy and inventory policy for a two-unit series system," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
- Zhao, Xian & Sun, Jinglei & Qiu, Qingan & Chen, Ke, 2021. "Optimal inspection and mission abort policies for systems subject to degradation," European Journal of Operational Research, Elsevier, vol. 292(2), pages 610-621.
- Shen, Jingyuan & Hu, Jiawen & Ma, Yizhong, 2020. "Two preventive replacement strategies for systems with protective auxiliary parts subject to degradation and economic dependence," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
- Xufeng Zhao & Mingchih Chen & Toshio Nakagawa, 2022. "Periodic replacement policies with shortage and excess costs," Annals of Operations Research, Springer, vol. 311(1), pages 469-487, April.
- Levitin, Gregory & Finkelstein, Maxim & Dai, Yuanshun, 2021. "Optimal shock-driven switching strategies with elements reuse in heterogeneous warm-standby systems," Reliability Engineering and System Safety, Elsevier, vol. 210(C).
- Shang, Lijun & Liu, Baoliang & Qiu, Qingan & Yang, Li & Du, Yongjun, 2023. "Designing warranty and maintenance policies for products subject to random working cycles," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
More about this item
Keywords
Element reactivation; Expected mission cost; m-out-of-n standby; Mission success probability; Operation and maintenance schedule; Preventive replacement;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:211:y:2021:i:c:s0951832021001320. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.